| Installation
26
|
Puranity TU+
VWR
Chapter 7
Bring your Puranity TU+ system into operation
NOTE!
After Installation all tubings have to be checked for their correct position on the
systems panel and that is no leakage after open the feedwater supply.
To avoid tripping, ensure that the tubings and wires do not lay over the floor.
Step
Action
Figure
1
Place the Puranity TU+ system at the
desired location (on the workbench,
under the workbench, or wall-mount).
A wall attachment kit is available for
wall-mounting (purchasing
separately).
See Section “Wall mounting” on page 31.
2
Remove the cover from the ultrapure
cartridge by pressing the snapper and
pull the cover off towards the front.
3
a.
Locate the ultrapure
cartridge.
b.
Place the ultrapure cartridge
in the rear section of the
system and insert the two
quick connectors into the
ultrapure cartridge. When
you hear an audible click
you can be sure that the
quick connectors have been
inserted correctly
NOTE!
The quick connectors are attached to
the system in such
a manner so as to prevent installing
the ultrapure
cartridge incorrectly.
Snapper
Cover
Ultrapure
cartridge
b.)
Quick connectors
Содержание Puranity TU 12 UV+
Страница 6: ...vi Puranity TU VWR...
Страница 18: ...Extend of delivery 10 Puranity TU VWR Chapter 3...
Страница 20: ...Intended use of the device 12 Puranity TU VWR Chapter 4...
Страница 29: ...VWR Puranity TU 21 Installation Connections of the Puranity TU 3 6 system 12 11 10 9 8 7 6 1 2 3 4 5...
Страница 44: ...Flow chart 36 Puranity TU VWR Chapter 8...
Страница 46: ...How the Puranity TU system functions 38 Puranity TU VWR Chapter 9...
Страница 72: ...Equipment disposal 64 Puranity TU VWR Chapter 14...
Страница 76: ...Consumables 68 Puranity TU VWR Chapter 16...
Страница 77: ...VWR Puranity TU 69 Terminal assignment...
Страница 78: ...Terminal assignment 70 Puranity TU VWR Chapter 17...
Страница 80: ...Maintenance record 72 Puranity TU VWR Chapter 18...
Страница 84: ...76 Puranity TU VWR Index...