Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
1.5
Removing and installing pressure pipe
Removing
– Detach connector from charge pressure sender -G31- .
– Release clip -3- from charge air hose -4-.
– Loosen bolt -1- of pressure pipe -2-.
– Unclip water hose from pressure pipe.
– Release lower clip
valve module -J338- .
– Remove pressure pipe.
Installing
– Installation is performed in the reverse sequence.
1.6
Removing and installing charge pres‐
sure sender -G31-
Removing
– Disconnect electrical connector -4- from charge pressure
sender -G31- .
– Unscrew bolts -2- and pull charge pressure sender -G31- /
-3- out of air duct -1-.
Installing
Installation is carried out in the reverse order. When installing,
note the following:
• Specified torque
.
Note
Renew O-ring.
1.7
Removing and installing charge air cool‐
er
Special tools and workshop equipment required
♦ Torque wrench -V.A.G 1410-
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
186
Rep. gr.21 - Turbocharging/supercharging