Pro
te
c
t
ed
b
y
co
p
y
rig
h
t.
C
o
p
y
in
g
fo
r
pr
iv
a
t
e
o
r
c
o
m
m
e
r
c
ia
l
p
u
rp
o
s
e
s
,
i
n
p
a
rt
o
r i
n
w
h
o
le
,
is
n
o
t
p
e
r
m
it
t
e
d
u
n
l
e
s
s
a
ut
ho
r
i
s
ed
b
y
V
olk
sw
a
ge
n AG
.
V
olk
s
w
a
g
en
AG do
es
n
ot g
uar
ante
e
or a
c
c
ep
t
a
ny
li
a
b
i
li
t
y
w
ith
r
e
s
p
e
c
t
t
o
th
e
c
o
rr
e
c
t
n
e
s
s
o
f
in
fo
r
m
a
tio
n
in
th
is
d
o
c
um
en
t.
C
o
py
rig
ht b
y
V
olk
sw
a
ge
n
A
G.
♦ Charge air system tester -V.A.G 1687-
– Release hose clip -1- and detach pressure hose -3- from tur‐
bocharger -2-.
– Depending on hose diameter, insert adapter -1687/10- ,
-1687/11- or -1687/12- in air duct -1- and secure with hose clip.
– Connect charge air system tester -V.A.G 1687- as shown in
figure.
Prepare charge air system tester -V.A.G 1687- as follows:
– Unscrew pressure control valve -2- completely, close valves
-3- and -4-.
Note
To turn the pressure regulating valve -2- the knob must be pulled
upwards.
Amarok 2011 ➤
4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
190
Rep. gr.21 - Turbocharging/supercharging