background image

28

7.10.1 CHECKING THE FAN SPEED

Locate the CO button (see Fig 40 pos SW1).

Select the main selector switch to the ON position, press the 
CO button once, the display will then scroll through the fan 
speeds along with the relevant icon.

7.10.2 THERMOREGULATION 

   

To set the temperature regulation curve, locate potentiometer 
(P3). By turning (P3), the curve is shown on the LCD display. 

The user can adjust the temperature of the heating system 
indirectly by changing the required room temperature from 
between 15°C & 25°C, this will allow the PCB to recalculate 
the system temperature required, the default temperature for 
calculating the curve is 20°C.
The graph below can be used to determine the correct curve 
setting.

REFERENCE 
TEMPERATURE 15 °C

REFERENCE 
TEMPERATURE 20 °C

REFERENCE 
TEMPERATURE 25 °C

20 °C

25 ° C

15 °C

10

20

30

40

50

60

70

80

90

-20

-15

-10

-5

0

5

10

15

20

25

30

ROOM TEMPERATURE CURVE OFFSET

DELIVER

Y

 TEMPERA

TURE 

(°C)

EXTERNAL TEMPERATURE (°C)

Fig. 42

The boiler is supplied with the adjustments shown in the table. Depending on plant engineering requirements or regional fl ue gas emission limits it is, however, 
possible to modify this value, referring to the graphs below.

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

180

190

200

210

220

230

240

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

COs.a. curve (Qnheating) 

Heat output (kW)

800

1200

1600

2000

2400

2800

3200

3600

4000

4400

4800

5200

5600

6000

6400

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

HTG curve (Qnheating) 

Heat output (kW)

Fan rotations (rpm)

CO emissions s.a. (p.p.m.)

Mynute

 i20

Mynute

 i30

1000

1400

1800

2200

2600

3000

3400

3800

4200

4600

5000

5400

5800

6200

0

4

8

12

16

20

24

28

32

36

40

HTG curve (Qnheating) 

Heat output (kW)

Fan rotations (rpm)

0

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

180

190

200

0

2

4

6

8

10

12

14

16

18

20

22

24

26

28

30

32

34

36

38

40

COs.a. curve (Qnheating) 

Heat output (kW)

CO emissions s.a. (p.p.m.)

Содержание Mynute i20

Страница 1: ...is a licensed member of the Benchmark scheme which aims to improve the standards of installation and which aims to improve the standards of installation and commissioning of domestic hot water system...

Страница 2: ...Mounting on a combustible surface 12 3A 9 Timber framed buildings 12 3A 10 Inhibitors 12 3A 11 Declaration of conformity 12 Installation Page 4 1 Delivery 13 4 2 Contents 13 4 3 Unpacking 13 4 4 Prep...

Страница 3: ...tomatically Dear Customer Your Vok ra Mynute i boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use...

Страница 4: ...unter clockwise to reduce the tem perature range 40 C 80 C for standard central heating The automatic temperature control function SARA is set within the blank bullet points MODE SELECTOR SWITCH HEATI...

Страница 5: ...ance status table for fault indicator and boiler status 2 3 LIGHTING THE BOILER Ensure the gas and electrical supply to the boiler are turned on Turn the mode selector switch to the ON position When t...

Страница 6: ...THE SYSTEM FOR LONG PERIODS If the house is to be left unoccupied for any length of time especially during the winter the system should be thoroughly drained of all water The gas water and electricit...

Страница 7: ...rary then final Reset check appliance operation Temperature differential Final Reset check appliance operation check thermistors A08 Return thermistor fault Temporary Check return thermistor check wir...

Страница 8: ...ons These appliances are designed for use with a sealed system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore...

Страница 9: ...nissensedbytheelectroniccircuittoensureflamestability at the burner Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15minutes Thereafte...

Страница 10: ...e i30 Sides 12mm Top 150mm from casing or 25mm above flue elbow whichever is applicable Bottom 150mm Front 600mm 2 7 Connections Mynute i20 Mynute i30 Flow return 22mm Gas 15mm Safety valve 15mm Conde...

Страница 11: ...300 mm Q From the top of the vertical terminal to the roof flashing As determined by the fixed collar of the vertical terminal R To the side of a boundary 300 mm S To the side of an opening or window...

Страница 12: ...high water content it may be necessary to provide additional expansion capacity see 6 18 3 6 6 FILLING POINT A method for initial filling of the system and replacing water lost during servicing etc di...

Страница 13: ...s no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed building it shouldbefittedinaccordancewiththeInst...

Страница 14: ...es with the local water authority regulations 3A 6 7 LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at...

Страница 15: ...on its vertical axis In addition the flue may be extended from the outlet elbow in the horizontal plane see2 9 Areductionmustalsobemadetothemaximumlength see table below when additional bends are use...

Страница 16: ...d be drilled LEVEL to ensure any condense fluid that forms is allowed to drain back to the appliance The fixing holes for the wall mounting bracket should now be drilled and plugged an appropriate typ...

Страница 17: ...ect the required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly Ensure that any horizontal sections of the flue system have a...

Страница 18: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 19: ...reen yellow to EARTH connection Insertthesupplied3 AMPfuseintothefusedisolatororfusedplug Should the fly lead be unsuitable refer to 4 7 3 for details on how to connect the electrical supply directly...

Страница 20: ...UK to ensure that correct combustion is occurring see flow chart on page 36 Additionally if the gas valve has been adjusted replaced or the appliance has been converted for use with another gas type...

Страница 21: ...SERVICING Check the operation of the appliance and ensure it functions as described in section 7 Compare the performance of the appliance with its design specification The cause of any noticeable dete...

Страница 22: ...and remove the air chamber front cover Remove the AAV locking pin M from the deaerator assembly and remove the AAV assembly N Replace in the reverse order 6 8 WATER PRESSURE SWITCH fig 29 Carry out co...

Страница 23: ...electrode leads and ancillary wiring from their respective connectors Remove the retaining screws W for electrode and remove 6 12 GAS VALVE fig 31 Carry out component removal procedure as described in...

Страница 24: ...cal an external expansion vessel may be fitted to the return pipe as close to the appliance as possible 6 18 1 EXPANSION VESSELREMOVAL with sufficient clearance above fig 37 Carry out component remova...

Страница 25: ...Locate and remove the screw A2 that secures the flue gas analysis test point cover B2 Remove the clip and the fumes thermostat C2 Locate and remove the screws D2 that se cure the flue collector to th...

Страница 26: ...sition and any additional controls time clock programmer room thermostat etc calling for heat the appliance will operate in the heating mode The pump and fan will be activated via the flow temperature...

Страница 27: ...PLETION On completion of the combustion analysis check and or any gas valve adjustment refit the plug fig 40 L2 and move the mode selector through position Remove the test probe from the test point an...

Страница 28: ...at the fuse has failed but no fault is in dicated a detailed continuity check will be required to trace the fault A visual inspection of components may also assist in locating the fault 7 7 3 POLARITY...

Страница 29: ...pm GAS VALVE CALIBRATION Connect the boiler to the power supply Open the gas tap Set the function selector to OFF RESET monitor off Remove the screws E remove the casing remove the re taining screw be...

Страница 30: ...0 15 20 25 30 ROOM TEMPERATURE CURVE OFFSET DELIVERY TEMPERATURE C EXTERNAL TEMPERATURE C Fig 42 The boiler is supplied with the adjustments shown in the table Depending on plant engineering requireme...

Страница 31: ...FLOW OUTLET TEMPERATURE C T80 Maximum set point for standard T range JP7 removed T45 Maximum set point for low T range JP7 inserted Fig 43 CN8 CN7 CN6 CN5 CN12 1 JP1 JP2 JP3 JP4 JP5 JP6 JP7 JP8 CN15...

Страница 32: ...appliance can be used with the following controls twin channel programmers The appliance can be used in conjunction with typical S Plan systems and Y Plan systems Please contact Vokera technical shou...

Страница 33: ...CN2 NO NC C black black BE11 FUNCTIONAL DIAGRAM Fig 45 S W CO2 function button F S 1 Flame sensor F1 Fuse 3 15A T F External fuse 3 15A F M3 Terminal strip for electrical connection hight power P Pum...

Страница 34: ...10 0 CO2 minimum output 10 0 10 0 CO maximum output ppm 190 160 CO minimum output ppm 20 15 CO2 FUNCTIONS ACTION ON THE BUTTON DISPLAY combustion analysis mode press once burner running at maximum hea...

Страница 35: ...H FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQ...

Страница 36: ...OHU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWU...

Страница 37: ...HSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UD...

Страница 38: ...R TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio les...

Страница 39: ...39...

Страница 40: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve t...

Отзывы: