background image

13

Fig. 10

4.1 DELIVERY   

Due to the weight of the appliance it may be necessary for 
two people to lift and attach the appliance to its mounting. The 
appliance is contained within a heavy-duty cardboard carton. 
Lay the carton on the fl oor with the writing the correct way up.

4.2 CONTENTS

Contained within the carton is:



the boiler



the wall bracket 



carton template



an accessories pack containing appliance service connections 
and washers



the instruction pack containing the installation, servicing & user 
instructions, guarantee registration card and a 3-amp fuse.

4.3 UNPACKING

At the top of the carton pull both sides open – do not use a 
knife – unfold the rest of the carton from around the appliance, 
carefully remove all protective packaging from the appliance and 
lay the accessories etc. to one side. Protective gloves should 
be used to lift the appliance, the appliance back-frame should 
be used for lifting points.

4.4 PREPARATION FOR MOUNTING THE AP-
PLIANCE

The appliance should be mounted on a smooth, vertical surfa-
ce, which must be capable of supporting the full weight of the 
appliance. Care should be exercised when determining the 
position of the appliance with respect to hidden obstructions 
such as pipes, cables, etc.
When the position of the appliance has been decided – using 
the template supplied – carefully mark the position of the wall 
mounting bracket (see fi g. 11) and fl ue-hole (if applicable).

4.5 FITTING THE FLUE

The top fl ue outlet permits both horizontal and vertical fl ue ap-
plications to be considered, alternatively, the Vokèra twin fl ue 
system can be utilised if longer fl ue runs are required. 

4.5.1 CONCENTRIC HORIZONTAL FLUE

(For concentric vertical fl ue, see 4.5.2).
(For twin fl ue applications, see 4.5.3).  
The appliance can be used with either the Vokèra condensing 
60/100mm concentric fl ue system or the optional 80/125mm 
concentric fl ue system.  

NOTE

These instructions relate 

only

 to the Vokèra condensing 

60/100mm concentric fl ue system. For specifi c details on the 
installation of the 80/125mm concentric fl ue system please refer 
to the instructions supplied. The appliance fl ue outlet elbow can 
be rotated through 360º on its vertical axis. In addition the fl ue 
may be extended from the outlet elbow in the horizontal plane 
(see 2.9). A reduction must also be made to the maximum length 
(see table below) when additional bends are used.

Reduction for additional bends

  Bend       Reduction in maximum fl ue length for each bend

 

  45º bend  1.0 metre (60/100) - 1.0 metre (80/125)  

  90º bend  1.0 metre (60/100) - 1.5 metre (80/125) 

Horizontal fl ue terminals and accessories

 Part No. 

Description 

Length 

 

 29450120  Horizontal fl ue kit 

900 mm 

   29450121 

Telescopic fl ue kit 

455/630 mm

  522 

Plume management kit 

1370 mm 

   29450123 

90-degree bend 

N/A 

   29450124 

45-degree bends (pair) 

N/A 

   29450125 

500mm extension 

500 mm

  

   29450126 

1000mm extension 

1000 mm 

   29450127 

2000m extension 

2000 mm 

   29450128 

Telescopic extension 

372/519 mm

   529 

Wall bracket pack (5) 

208mm

Using the template provided, mark and drill a 125mm hole for 
the passage of the fl ue pipe. The hole should be drilled to ensure 
any condense fl uid that forms, is allowed to drain back to the 
appliance (see fi g. 12-14). The fi xing holes for the wall-mounting 
bracket should now be drilled and plugged, an appropriate type 
and quantity of fi xing should be used to ensure that the bracket 
is mounted securely. 
Once the bracket  (

A

) has been secured to the wall, mount the 

appliance onto the bracket.

FITTING THE HORIZONTAL FLUE KIT

Carefully measure the distance from the centre of the appliance 
fl ue outlet to the edge of the fi nished outside wall (dimension 
X). Add 65mm to dimension X to give you Dimension Y (see 
fi g 16). Measure dimension Y from the terminal end of the con-
centric fl ue pipe and cut off the excess ensuring any burrs are 
removed. Pass the concentric fl ue pipe through the previously 
drilled hole. Fit the fl ue bend to the boiler fl ue outlet and insert 
the concentric fl ue pipe into the fl ue bend ensuring the correct 
seal is made.

 

Using the clamp, gasket, and screws supplied, 

secure the fl ue bend to the appliance fl ue spigot. 

NOTE

Fit the internal (white) trim to the fl ue assembly prior to con-
necting the fl ue pipe to the bend.
You must ensure that the entire fl ue system is properly sup-
ported and connected. Seal the fl ue assembly to the wall using 
cement or a suitable alternative that will provide satisfactory 
weatherproofi ng. The exterior trim can now be fi tted.

SECTION 4 - INSTALLATION

 Fig. 9

A

Terminal or 
extension

Outer clamps

Содержание Mynute i20

Страница 1: ...is a licensed member of the Benchmark scheme which aims to improve the standards of installation and which aims to improve the standards of installation and commissioning of domestic hot water system...

Страница 2: ...Mounting on a combustible surface 12 3A 9 Timber framed buildings 12 3A 10 Inhibitors 12 3A 11 Declaration of conformity 12 Installation Page 4 1 Delivery 13 4 2 Contents 13 4 3 Unpacking 13 4 4 Prep...

Страница 3: ...tomatically Dear Customer Your Vok ra Mynute i boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use...

Страница 4: ...unter clockwise to reduce the tem perature range 40 C 80 C for standard central heating The automatic temperature control function SARA is set within the blank bullet points MODE SELECTOR SWITCH HEATI...

Страница 5: ...ance status table for fault indicator and boiler status 2 3 LIGHTING THE BOILER Ensure the gas and electrical supply to the boiler are turned on Turn the mode selector switch to the ON position When t...

Страница 6: ...THE SYSTEM FOR LONG PERIODS If the house is to be left unoccupied for any length of time especially during the winter the system should be thoroughly drained of all water The gas water and electricit...

Страница 7: ...rary then final Reset check appliance operation Temperature differential Final Reset check appliance operation check thermistors A08 Return thermistor fault Temporary Check return thermistor check wir...

Страница 8: ...ons These appliances are designed for use with a sealed system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore...

Страница 9: ...nissensedbytheelectroniccircuittoensureflamestability at the burner Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15minutes Thereafte...

Страница 10: ...e i30 Sides 12mm Top 150mm from casing or 25mm above flue elbow whichever is applicable Bottom 150mm Front 600mm 2 7 Connections Mynute i20 Mynute i30 Flow return 22mm Gas 15mm Safety valve 15mm Conde...

Страница 11: ...300 mm Q From the top of the vertical terminal to the roof flashing As determined by the fixed collar of the vertical terminal R To the side of a boundary 300 mm S To the side of an opening or window...

Страница 12: ...high water content it may be necessary to provide additional expansion capacity see 6 18 3 6 6 FILLING POINT A method for initial filling of the system and replacing water lost during servicing etc di...

Страница 13: ...s no requirement for a sheet of fireproof material to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed building it shouldbefittedinaccordancewiththeInst...

Страница 14: ...es with the local water authority regulations 3A 6 7 LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at...

Страница 15: ...on its vertical axis In addition the flue may be extended from the outlet elbow in the horizontal plane see2 9 Areductionmustalsobemadetothemaximumlength see table below when additional bends are use...

Страница 16: ...d be drilled LEVEL to ensure any condense fluid that forms is allowed to drain back to the appliance The fixing holes for the wall mounting bracket should now be drilled and plugged an appropriate typ...

Страница 17: ...ect the required number of flue extensions or bends up to the maximum equivalent flue length between the boiler and vertical flue assembly Ensure that any horizontal sections of the flue system have a...

Страница 18: ...flue kit for termination The horizontal terminal is supplied with a built in converter box and cannot be shortened A 130mm hole is required for the passage of the concentric terminal through the wall...

Страница 19: ...reen yellow to EARTH connection Insertthesupplied3 AMPfuseintothefusedisolatororfusedplug Should the fly lead be unsuitable refer to 4 7 3 for details on how to connect the electrical supply directly...

Страница 20: ...UK to ensure that correct combustion is occurring see flow chart on page 36 Additionally if the gas valve has been adjusted replaced or the appliance has been converted for use with another gas type...

Страница 21: ...SERVICING Check the operation of the appliance and ensure it functions as described in section 7 Compare the performance of the appliance with its design specification The cause of any noticeable dete...

Страница 22: ...and remove the air chamber front cover Remove the AAV locking pin M from the deaerator assembly and remove the AAV assembly N Replace in the reverse order 6 8 WATER PRESSURE SWITCH fig 29 Carry out co...

Страница 23: ...electrode leads and ancillary wiring from their respective connectors Remove the retaining screws W for electrode and remove 6 12 GAS VALVE fig 31 Carry out component removal procedure as described in...

Страница 24: ...cal an external expansion vessel may be fitted to the return pipe as close to the appliance as possible 6 18 1 EXPANSION VESSELREMOVAL with sufficient clearance above fig 37 Carry out component remova...

Страница 25: ...Locate and remove the screw A2 that secures the flue gas analysis test point cover B2 Remove the clip and the fumes thermostat C2 Locate and remove the screws D2 that se cure the flue collector to th...

Страница 26: ...sition and any additional controls time clock programmer room thermostat etc calling for heat the appliance will operate in the heating mode The pump and fan will be activated via the flow temperature...

Страница 27: ...PLETION On completion of the combustion analysis check and or any gas valve adjustment refit the plug fig 40 L2 and move the mode selector through position Remove the test probe from the test point an...

Страница 28: ...at the fuse has failed but no fault is in dicated a detailed continuity check will be required to trace the fault A visual inspection of components may also assist in locating the fault 7 7 3 POLARITY...

Страница 29: ...pm GAS VALVE CALIBRATION Connect the boiler to the power supply Open the gas tap Set the function selector to OFF RESET monitor off Remove the screws E remove the casing remove the re taining screw be...

Страница 30: ...0 15 20 25 30 ROOM TEMPERATURE CURVE OFFSET DELIVERY TEMPERATURE C EXTERNAL TEMPERATURE C Fig 42 The boiler is supplied with the adjustments shown in the table Depending on plant engineering requireme...

Страница 31: ...FLOW OUTLET TEMPERATURE C T80 Maximum set point for standard T range JP7 removed T45 Maximum set point for low T range JP7 inserted Fig 43 CN8 CN7 CN6 CN5 CN12 1 JP1 JP2 JP3 JP4 JP5 JP6 JP7 JP8 CN15...

Страница 32: ...appliance can be used with the following controls twin channel programmers The appliance can be used in conjunction with typical S Plan systems and Y Plan systems Please contact Vokera technical shou...

Страница 33: ...CN2 NO NC C black black BE11 FUNCTIONAL DIAGRAM Fig 45 S W CO2 function button F S 1 Flame sensor F1 Fuse 3 15A T F External fuse 3 15A F M3 Terminal strip for electrical connection hight power P Pum...

Страница 34: ...10 0 CO2 minimum output 10 0 10 0 CO maximum output ppm 190 160 CO minimum output ppm 20 15 CO2 FUNCTIONS ACTION ON THE BUTTON DISPLAY combustion analysis mode press once burner running at maximum hea...

Страница 35: ...H FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQ...

Страница 36: ...OHU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWU...

Страница 37: ...HSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UD...

Страница 38: ...R TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio les...

Страница 39: ...39...

Страница 40: ...ies vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve t...

Отзывы: