background image

8

2.10 Efficiency

Excel 25

Excel 29

SEDBUK (%)

90.0

90.2

2.11 Emissions

Excel 25

Excel 29

CO2 @ maximum output (%)

9.0

9.0

CO2 @ minimum output (%)

9.5

9.5

CO @ maximum output (ppm)

180

160

CO @ minimum output (ppm)

20

20

NOx rating

class 5 

class 5

Fig. 6

2.12  PUMP DUTY

Fig. 6 shows the flow-rate available – after 

allowing for pressure loss through the ap-

pliance – for system requirements. When 

using this graph, apply only the pressure 

loss of the system. The graph is based on 

a 20

o

C temperature differential.

Fig. 7

Flow rate (l/h)

Residual head (x 100 mbar)

1st speed

2nd speed

3rd speed

0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

4,0

4,5

5,0

0

100

200

300

400

500

600

700

800

900

1000

Portata (l/h)

Prevalenza (mH2O)

 

Key 

Location 

Minimum distance

  A 

Below an opening (window, air-brick, etc.) 

300 mm

  B 

Above an opening (window, air-brick, etc.) 

300 mm

  C 

To the side of an opening (window, air-brick, etc.) 

300 mm

  D 

Below gutter, drain-pipe, etc. 

25 mm

  E 

Below eaves 

25 mm

  F 

Below balcony, car-port roof, etc. 

25 mm

  G 

To the side of a soil/drain-pipe, etc. 

25 mm (60mm for 80/125 - 5” flue)

  H 

From internal/external corner 

25 mm (60mm for 80/125 - 5” flue)

  I 

Above ground, roof, or balcony level 

300 mm

  J 

From a surface or boundary facing the terminal 

600 mm

  K 

From a terminal facing a terminal 

1200 mm

  L 

From an opening in the car-port into the building 

1200 mm

  M 

Vertically from a terminal on the same wall 

1500 mm

  N 

Horizontally from a terminal on the same wall 

300 mm

  P 

From a structure to the side of the vertical terminal 

300 mm

  Q 

From the top of the vertical terminal to the roof flashing 

As determined by the fixed collar 

   

 

of the vertical terminal

  R 

To the side of a boundary 

300 mm

  S 

To the side of an opening or window on a pitched roof 

600 mm

  T 

Below an opening or window on a pitched roof 

2000 mm

  V 

From a vertical terminal to an adjacent opening (window, air-brick, etc.) 

(call Vokera technical for advice)

  W 

From a vertical terminal to an adjacent vertical terminal 

300 mm (only if both terminals are the same hight)

Содержание Excel 25

Страница 1: ...S TO BE RETAINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK Excel High ef...

Страница 2: ...3A 5 Air supply 11 3A 6 Water circulation 11 3A 7 Electrical supply 11 3A 8 Mounting on a combustible surface 11 3A 9 Timber framed buildings 11 3A 10 Inhibitors 11 3A 11 Showers 11 3A 12 Declaration...

Страница 3: ...el boiler has been designed to meet and exceed the very latest standards in gas central heating technology and if cared for will give years of reliable use and efficiency Please therefore take some ti...

Страница 4: ...et temperature or counter clockwise to reduce the temperature range 37 C 60 C Boiler at OFF standby Select this position when you want the boiler to be switched off for short periods days or if the bo...

Страница 5: ...may be necessary to reduce the flow of water at the hot water outlet tap NOTE If the appliance fails to ignite during the ignition sequence it will enter a lockout condition Should this occur please a...

Страница 6: ...switch in the bottom position To select OFF mode move the selector switch in the upper position APPLIANCE STATUS LED AND FAULT CODES Fig 3 4 WHAT IF 5 SETTING THE VOK RA Advice for homeowners Please c...

Страница 7: ...use with a sealed system only consequently they are not intended for use on open vented systems This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet...

Страница 8: ...the boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the...

Страница 9: ...ume 74 litres Pre charge pressure 1 bar 2 5 Dimensions Excel 25 Excel 29 Height mm 715 Width mm 405 Depth mm 250 Dry weight kg 28 29 2 6 Clearances Excel 25 Excel 29 Sides 12mm Top 150mm from casing o...

Страница 10: ...ain pipe etc 25 mm E Below eaves 25 mm F Below balcony car port roof etc 25 mm G To the side of a soil drain pipe etc 25 mm 60mm for 80 125 5 flue H From internal external corner 25 mm 60mm for 80 125...

Страница 11: ...n vessel to accom modate the increased volume of water when the system is heated It can accept up to 8 litres of expansion from within the system generally this is sufficient however if the system has...

Страница 12: ...is to be fitted on a wall of combustible material There is no requirement to protect the wall 3 9 TIMBER FRAMED BUILDINGS If the appliance is to be fitted in a timber framed building it shouldbefitte...

Страница 13: ...W PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the highest point in the system an...

Страница 14: ...plane see2 9 Areductionmustalsobemadetothemaximumlength see table below when additional bends are used Reduction for additional bends Bend Reduction in maximum flue length for each bend 45 bend 1 0 me...

Страница 15: ...e installation of the 80 125mm concentric flue system please refer to the instructions supplied The vertical flue terminal can be connected directly to the ap pliance flue outlet Alternatively an exte...

Страница 16: ...ir 2000mm 0225840 45 bend pair N A 0225845 90 bend pair N A 0225850 Twin bracket 5 N A 0225855 Single bracket 5 N A MOUNTING THE BOILER The fixing holes for the wall mounting bracket should now be dri...

Страница 17: ...wards the appliance 17mm per 1000mm Fig 13c Fig 14 4 6 CONNECTING THE GAS AND WATER The appliance is supplied with an accessory pack that includes service valves Theservicevalvesareforwelding Theacces...

Страница 18: ...circuits please refer to section 8 for detailed instructions ANYEXTERNALCONTROLOR WIRING MUST BE SERVED FROM THE SAME ISOLATOR AS THAT OF THE APPLIANCE The supply cable from the isolator to the appli...

Страница 19: ...d properly and in ac cordance with the instructions ensure all appliance service valves are open 5 6 INITIAL LIGHTING Ensure the electrical supply to the appliance is switched on Ensure any external c...

Страница 20: ...tres flow restrictor 5 12 FINAL CHECKS ENSURE ALL TEST NIPPLES ON THE APPLIANCE GAS VALVE ARE TIGHT AND CHECKED FOR TIGHTNESS ENSURE THE APPLIANCE FLUE SYSTEM IS FITTED CORRECTLY AND IS PROPERLY SECUR...

Страница 21: ...ved from the appliance Replace carefully in the reverse order 6 6 SAFETY VALVE fig 22 Carry out component removal procedure as described in 6 4 Disconnect the outlet pipe G from the safety valve remov...

Страница 22: ...omponent removal procedure as described in 6 4 Remove the air chamber front cover Disconnect the electrode leads and ancillary wiring from their respective connectors Re move the retaining screws V fo...

Страница 23: ...ibed in 6 4 Remove the locking pin Q1 that secures the cover R1 to the hydraulic manifold Using a hooked piece of wire carefully withdraw the by pass cartridge S1 and or DHW non return cartridge T1 En...

Страница 24: ...onnectthewiringtotheDHWflowswitch Slacken and unscrew the inlet connection Unscrew the nut E2 Lift the DHW flow switch housing from its seating If necessary remove the locking pin F2 from the DHW flow...

Страница 25: ...sed for more that 20 minutes 7 2 3 HEATING MODE With the selector switch in the heating hot water position and any additional controls time clock programmer room thermostat etc calling for heat the ap...

Страница 26: ...ut the component removal procedure as described in 6 4 You must ensure that the boiler is completely drained of water Using a suitable pressure gauge remove dust cap on expansion vessel and check the...

Страница 27: ...letion of any task that required the disconnection and re connection of any electrical wiring or component these checks must be repeated 7 8 FAULT FINDING Before attempting any faultfinding the electr...

Страница 28: ...c information on the suitability of a particular control Further guidance on the recom mended practice for the installation of external controls can be found in CHeSS HC5 HC6 www energyefficiency gov...

Страница 29: ...oiler lock out CN1 CN15 Connectors CN5 Room thermostat 24 Vdc S W CO2 function button F S 1 Flame sensor F1 Fuse 3 15A T F External fuse 3 15A F M3 Terminal strip for electrical connection hight power...

Страница 30: ...yellow led blinking gas valve maximun setting press twice burner running at maximum DHW yellow led blinking red led fixed gas valve minimum setting press three time burner running at minimum yellow l...

Страница 31: ...3 However if the CO2 reading is incorrect the minimum gas pressure must be adjusted as follows locate the minimum adjustment screw fig 37 using a suit able screwdriver remove the protection plug using...

Страница 32: ......

Страница 33: ......

Страница 34: ...to stabilise YES Is CO less than 350ppm AND CO CO2 ratio less than 0 004 NO Boiler is operating satisfactorily No further actions required Ensure test points are capped boiler case is correctly repla...

Страница 35: ......

Страница 36: ...s vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the...

Отзывы: