background image

VIKING TECHNICAL SUPPORT 1.800.908.0884

2 0

LIMITS SETUP

Tip: 

The gate can be moved electronically with the “Open”, “Stop” and “Close” buttons 

on the Control Board or manually by following the instructions on page 7.

STEP 1

Connect the “Motor Harness” to the Control 
Board.

a.  “OPEN RIGHT” Connector if the gate opens 

to the Right, when viewed from inside.

b.  “OPEN LEFT” Connector if the gate opens 

to the Left, when viewed from inside.

STEP 2

Position the gate to one of the desired 
limit positions then press and hold the 
corresponding Limit Button until the LED 
stops flashing and illuminates solid.

Repeat this step for the other limit position.

!

 

NOTE: 

1.  The 1st cycle after the limit setup is the “Learn Cycle”. Allow at least one complete 

cycle to confirm your settings.

2.  During the limit setup process, the operator will run at half speed.

To Readjust Limits:

1.  Clear the current limit setting by holding down the corresponding Limit Button until 

the LED is flashing.

2.  Repeat STEP 2 above to set the limit.

LIMIT LED INDICATIONS

OFF

Gate is not at the set limit position.

SOLID

Gate is at the set limit position.

FLASHING

Limit position is not set or has been erased.

2

1

Содержание K-2S

Страница 1: ...INSTALLATION INSTRUCTIONS AND SAFETY INFORMATION FOR THE VIKING K 2S GATE OPER ATOR NEW IMAGE U L 3 2 5 C L A S S I C O M P L I A N T Solar Residential Vehicular Slide Gate Operator...

Страница 2: ...inimizes current draw NEW Smart Position Sensor tracks the exact gate position during power outages and when the gate is moved manually Hold Open Timer to automatically close the gate Intelligent obst...

Страница 3: ...RATOR INSTALLATION 12 15 Concrete Pad Option 12 Post Mounting Option 13 Operator Positioning 14 15 ELECTRICAL INSTALLATION 16 19 Battery Solar Panel Selection 16 Solar Panel Care Installation Tips 17...

Страница 4: ...Class of the gate refer to page 5 b All openings of a horizontal slide gate are guarded or screened from the bottom of the gate to a minimum of 6 feet 1 83 m above the ground to prevent a 2 1 4 inch 5...

Страница 5: ...Viking FA XP30 10K Seco Larm E 931 33PRGQ E 936 S45RRGQ E 931 S50RRGQ E 960 D90GQ EMX NIR 50 325 10 For a gate operator utilizing a contact sensor edge sensor or like in accordance with section 32 1...

Страница 6: ...must be used only for that which it has been expressly designed Any other use is to be considered improper and therefore dangerous The manufacturer cannot be held responsible for possible damage caus...

Страница 7: ...for use in a commercial location or building such as a multi family housing unit five or more single family units hotel garages retail store or other building servicing the general public INDUSTRIAL L...

Страница 8: ...ensor MUST be 10K Resistor Based You may connect up to FOUR monitored sensors wired in parallel to either the UL and or Re Open terminals for a total of 8 monitored sensors Failure to install the requ...

Страница 9: ...elease the Diagnose button until you see UL LEARN NO LEARN on the LCD Display Press and hold the Stop button Toggle the Diagnose button once The number of Monitored sensors connected to the UL or Re O...

Страница 10: ...n within the sight of the gate away from moving parts of the gate and out of reach of children a Controls intended for user activation must be located at least six feet 6 away from any moving part of...

Страница 11: ...of two placards shall be in stalled A placard is to be installed in the area of each side of the gate and be visible CLOSE STOP OPEN Locate Control Buttons Within sight of the gate At a minimum heigh...

Страница 12: ...Typical 5 0A Accessory Current Maximum 750mA Power Consumption Sleep 19mA 1 OPERATOR COVER 2 COVER LOCK 3 SOLAR CONTROL BOARD 4 SOLAR CHARGER regulates and distributes solar power 5 MANUAL RELEASE MO...

Страница 13: ...ns pg 26 33 15 PRIMARY SECONDARY Terminal Block wired Primary Secondary pg 21 16 CONTROL BOARD MOUNTING HOLES secures and grounds the Control Board 17 Siren Terminal Block Vikings UL Siren is connecte...

Страница 14: ...ll low power accessories such as loop detector leads maglock non contact sensors contact sensors safety and other commands Also provide conduit for the power supply to the operator DO NOT run low volt...

Страница 15: ...er of conduit pathways for all low power acces sories such as loop detector leads maglock non contact sensors contact sensors safety and other commands Also provide conduit for the power supply to the...

Страница 16: ...t the gate covers in the open position GATE OPERATOR INSTALLATION Gate Safety Guard Fixed Pulley Route Chain As Shown Plans for Rear Installation Gate Operator Concrete Pad Gate Operator Concrete Pad...

Страница 17: ...gate STEP 2 Chain Installation Before welding the provided chain brackets make sure the chain will be in a straight line with and at the same height as the chain leaving the gate operator rollers STEP...

Страница 18: ...rings bracelets and keys CAUTION A battery can present a risk of electrical shock burn from high short circuit current fire or explosion from vented gasses Observe proper precautions Observe proper p...

Страница 19: ...with a soft cloth using a mild detergent and water Install solar panels in the following conditions Operating temperature 40 F to 185 F Humidity Below 85RH Wind pressure Below 50 12lb ft 2400Pa Snow...

Страница 20: ...ces such as photo beams from this terminal STEP 2 Connect the 12V Battery to the terminals labeled Battery Caution Ensure correct polarity STEP 3 Turn the PANEL switch to the RESET position STEP 5 Con...

Страница 21: ...ered Pages 6 7 Check for proper operation When a connected device is triggered the Re Open LED will illuminate and if more than one Monitored device connected the Stop LED will flash rapidly to indica...

Страница 22: ...itions then press and hold the corresponding Limit Button until the LED stops flashing and illuminates solid Repeat this step for the other limit position NOTE 1 The 1st cycle after the limit setup is...

Страница 23: ...gle the Diagnose button once The feature should now be displayed as ON Step 2 At the Primary Operator Connect the entrapment protection sensor s as described on pages 7 and 19 Step 1 Connect shielded...

Страница 24: ...ng the dial between 0 and OFF will disable this feature requiring a close command to close the gate Speed Motor Speed Increases or decreases the speed of gate travel Overlap Overlap Delay This Feature...

Страница 25: ...ontact between COM and N O 2 Until gate reaches either limit AUX PWR terminals provide 24VDC EXT Available for future developments Last Open Power Failure Option Opens the gate automatically when the...

Страница 26: ...entrapment events sensed by the Inherent Entrapment Protection of the Gate Operator The audible alarm will sound for a period of 5 minutes or until a Stop command or the Alarm Reset switch has been ac...

Страница 27: ...VIKING TECHNICAL SUPPORT 1 800 908 0884 25 THIS PAGE LEFT BLANK INTENTIONALLY...

Страница 28: ...en Terminals Connections and Input Functions Viking Terminal Function Device Terminal 28V DC Positive GND DC Negative GND Relay Common C Radio N O If Timer OFF Open Stop Close If Timer ON Open Reopen...

Страница 29: ...e Input Terminal 3 Terminal Block On the Viking Control Board a removable block containing multiple terminals 4 Relay The component of an access control or safety device that provides an input or comm...

Страница 30: ...EP 2 Program the FA XT4RC Radio Transmitters to the FA XR2C Radio Receiver Follow the instructions provided with the Transmitters ACCESSORY CONNECTIONS TECHNICAL TIP The Control Board provides two mod...

Страница 31: ...RT 1 800 908 0884 29 Photocell NOTE The operator may be equipped with a FA XP30 10K Photocell Refer to pages 6 7 for UL325 requirements ACCESSORY CONNECTIONS RX DL1 DL4 SW1 NC NC NO COM SW1 DL1 DL2 TX...

Страница 32: ...loop detectors that would need to be wired to the Control Board Loop Rack Part VA LR Loop Rack Wiring Harness Part VA LRH ACCESSORY CONNECTIONS Re Open Center Twist Wire Outside the Loop 6 Twists Foo...

Страница 33: ...e sensitivity of the vehicular loop detector unit as needed A 5 A A A Gates in Closed Position Inside Reopen Loop Outside Reopen Loop Exit Loop Dimension A 5 for Single Gate 6 for Dual Gate Twist Wire...

Страница 34: ...VIKING TECHNICAL SUPPORT 1 800 908 0884 32 THIS PAGE LEFT BLANK INTENTIONALLY...

Страница 35: ...he pin headers labeled SYNC 1 3 2 4 Barrier Arm Synchronization NOTE The Control Board provides a convenient solution for applications that require synchronized operation with a Barrier Arm Operator C...

Страница 36: ...en 7 8 3 Battery Low OFF Normal Condition SOLID Does not apply to Solar Units 1 2 3 FLASHING Batteries critically low Check power supply to the operator pg 16 18 1 2 3 4 POWER SOLID Normal Condition O...

Страница 37: ...ected to the Close terminal pg 26 9 10 13 Siren OFF Normal Condition SOLID Second consecutive obstruction has been detected pg 22 24 1 2 11 13 FLASHING Batteries are critically low 1 2 14 Aux Pwr OFF...

Страница 38: ...S SPS Indicates the Model of the unit System Status Messages GATE IS IDLE Gate is stopped between limits GATE IS OPENING Gate is opening GATE IS CLOSING Gate is closing GATE IS OPENED Gate is at the l...

Страница 39: ...1 24 17 RED CONN UNPLUGED The Motor Connector is not plugged into the red Open Left or Open Right socket at the Control Board pg 20 21 Multi Meter Displays MOT AMP __ _ A This is the motor current amp...

Страница 40: ...e is no voltage being provided from the Solar Panel 1 ERR CHRG HIGH Potential problem with the Solar Charger 1 2 ERR BAT LOW The voltage from the Battery is low 1 2 3 ERR FUSE 15 AMP 15 Amp motor fuse...

Страница 41: ...es not see any data from the EPS Sensor This will also prevent the Lock Mode feature from functioning 14 ERR SPS WRONG The SPS communication cable has a connection problem or damaged The reference vol...

Страница 42: ...22 24 12 Check that the gate can be moved manually with low resistance throughout its full length of travel Check gate track rollers chain and hinges as applicable pg 4 7 13 Check the limit position...

Страница 43: ...ual Release Switch DUMRS10 10 Power Switch DUMRS10 11 Solar Charger VSCHARGSLSPS 12 Solar Terminal Block Assembly VSTBASLSPS 13 Solar Battery Breaker VASBB25 14 Solar Panel Switch DUMRS5 15 Solar Cont...

Страница 44: ...y shall not apply to products or parts thereof which have been repaired or altered without Seller s written consent outside of Sellers s workshop or altered in any way so as in the judgment of Seller...

Страница 45: ...age to property and injury to or death of any persons This limited warranty extends only to wholesale customers who buy directly through the Seller s normal distribution channels The Seller does not w...

Страница 46: ...mponents 12V 40W Solar Panels Part VA SO40W 12V 35Ah batteries Part DUBA35 NOTE The number of cycles achieved are dependent upon the following and may require increased panel and battery capacities Po...

Страница 47: ...rning algorithms redundancy design in both hardware and software to ensure operation and functionality protection from lightning short circuit and power surges and our exclusive drive train design off...

Страница 48: ...________________________________ COMPANY INSTALLER ________________________________ CONTACT __________________________________________ SERIAL NUMBER S ____________________________________ A LL I N S T...

Отзывы: