VIKING TECHNICAL SUPPORT 1.800.908.0884
1 3
Post Mounting Option
TIP:
The operator is equipped for post mount applications and is
ready for installation
.
You will only need to supply the posts and U-Bolts.
1. Consult the local building codes for the depth and concrete requirements.
2. Maximum 3.00” OD pipe.
3. Provide a sufficient number of conduit pathways for all low power acces-
sories such as loop detector leads, maglock, non-contact sensors, contact
sensors, safety and other commands. Also provide conduit for the power
supply to the operator.
!
DO NOT run low voltage and high voltage wiring in the same conduit.
!
Provide at least 12” separation between low and high voltage conduits.
GATE OPERATOR INSTALLATION
5¾"
4"
Minimum
Gate
16"
(Reference)
3¾"
15
⅞
"
with 2-½” IPS Pipe
(2
⅞
” OD)
Grade Level
Consult Local Codes
for Depth and Concrete
Requirements
3" O.D. Pipe
(Maximum)
Top of Pipe