GATE OPERATOR INSTALLATION
Concrete Pad Option
1. Follow the local building code to determine the required depth of the
concrete pad.
2. Pad measurements recommended by Viking Access Systems are at least
24” long, 18” wide and 24” deep to ensure the stable operation of the
operator, and a minimum of 4” above level grade to avoid any flooding of
the machinery.
3. Provide a sufficient number of conduit pathways for all low power
accessories such as loop detector leads, maglock, non-contact sensors,
contact sensors, safety and other commands. Also provide conduit for the
power supply to the operator.
!
DO NOT run low voltage and high voltage wiring in the same conduit.
!
Provide at least 12” separation between low and high voltage conduits.
10½"
Center of
Drive Chain
Drill for
½" x 3½"
Red Head Anchor (4)
18"
8½"
1½"
2"
24"
11"
Track
2"
4"
Minimum
4"
Minimum
24"
16"
13"
Conduit Location
1½"
4"
Possible Area
for Conduits
(1" Max Height)
Gate Operator
Concrete Pad
Gate Operator Concrete Pad
Install a Positive
Stop at Both Ends
of the Track
Operator Cover
Gate
Grade Level
See Note 2
Operator Chassis