Filling the siphon with water
1.
Remove the retaining clip and
siphon
A
.
2.
Fill the siphon with water.
3.
Fit siphon
A
and secure with the
retaining clip.
Setting the time and date (if required)
–
only for weather-
compensated control units
Note
&
During commissioning, or after a
prolonged time out of use, it may be
necessary to reset the time and
date, if the time flashes in the dis-
play.
&
During commissioning these terms
appear in German (delivered condi-
tion):
Time (see step 1)
Date (see step 2)
Press the following keys:
1.
a
/
b
for the current time.
2.
d
to confirm; "
Datum
" (date)
is displayed.
3.
a
/
b
for the current date.
4.
d
to confirm.
Further details regarding the individual steps
(cont.)
9
Commissioning, inspection, maintenance
5692
731
GB
Содержание VITODENS 333-F WS3A
Страница 109: ...A1 Main PCB A2 Power supply unit Connection and wiring diagram external connections 109 Designs 5692 731 GB ...
Страница 113: ...Parts lists cont 113 Parts lists 5692 731 GB ...
Страница 114: ...Parts lists cont 114 Parts lists 5692 731 GB ...
Страница 115: ...Parts lists cont 115 Parts lists 5692 731 GB ...
Страница 116: ...Parts lists cont 116 Parts lists 5692 731 GB ...
Страница 117: ...Parts lists cont 117 Parts lists 5692 731 GB ...