3
Installation sequence
General installation information............................................................................
4
■ Design...............................................................................................................
4
■ Flue gas temperature protection.......................................................................
4
■ Installation information......................................................................................
4
■ Required tools/equipment.................................................................................
5
■ Fitting the balanced flue slide coupling.............................................................
6
■ Tightness test....................................................................................................
7
■ Certification of the balanced flue system..........................................................
7
■ System certification...........................................................................................
8
Installations requirements....................................................................................
9
■ Statutory requirements......................................................................................
9
■ Gas safety (installation and use) regulations (current issue)............................
9
■ Boiler position................................................................................................... 10
Routing through a shaft........................................................................................ 15
■ Installation information...................................................................................... 15
■ Rigid flue........................................................................................................... 16
■ Flexible flue....................................................................................................... 26
Installation in a disused chimney.......................................................................... 36
■ Installation requirements................................................................................... 36
■ Installation......................................................................................................... 38
Vertical outlet for pitched or flat roofs................................................................... 41
■ Maximum flue length......................................................................................... 42
■ Installation......................................................................................................... 44
External wall connection....................................................................................... 47
■ Installation......................................................................................................... 49
Routing over an external wall............................................................................... 51
■ Maximum flue length......................................................................................... 52
■ Installation......................................................................................................... 52
Plume kit............................................................................................................... 54
■ Routing options................................................................................................. 54
Index
5780 223 GB
Содержание Vitocaldens 222-F
Страница 56: ...56 35 4 35 35 4 Insert screws into the wall in accordance with the pipe length Plume kit cont 5780 223 GB ...
Страница 58: ...58 5780 223 GB ...
Страница 59: ...59 5780 223 GB ...