18
Open flue operation
3
2
3
4
3
2
2
2
2
1
6
5
4
A
B
A
D
E
C
3
A
Secondary ventilation
B
Flue gas
C
Inspection port
D
Supply air vent
E
Supply air
1
Boiler flue connection
2
Standard shaft pack
Comprising:
■ Support bend
■ Support rail
■ Shaft cover
■ Spacers (5 pce)
3
Flue pipe
2 m long
1 m long
0.5 m long
Flue bend
(for use in corbelled
chimneys)
30° or 15°
4
Inspection piece,
straight
5
Flue bend
87° or 2 x 45°
or
Inspection tee
87°
6
Ventilation bezel
Adaptor
7
60 mm to
7
80 mm
Routing through a shaft
(cont.)
5780 223 GB
Содержание Vitocaldens 222-F
Страница 56: ...56 35 4 35 35 4 Insert screws into the wall in accordance with the pipe length Plume kit cont 5780 223 GB ...
Страница 58: ...58 5780 223 GB ...
Страница 59: ...59 5780 223 GB ...