24
200
80±10
50
1.
Have the highest pipe section end
approx. 80 mm below the top edge
of the shaft.
B
A
2.
Push on metal pipe section
A
. If
required, use an extension (acces-
sories).
3.
Position shaft cover
B
and secure
to the shaft with the fixing materials
provided.
Routing through a shaft
(cont.)
5780 223 GB