20
3
3
2
4
3
2
2
5
7
8
6
C
1
C
B
A
E
D
A
Supply air
B
Flue gas
C
Secondary ventilation
D
Aperture for interconnected air
supply
E
Inspection port
1
Boiler flue connection
2
Standard shaft pack
Comprising:
■ Support bend
■ Support rail
■ Shaft cover
■ Spacers (5 pce)
3
Flue pipe
2 m long
1 m long
0.5 m long
Flue bend
(for use in corbelled
chimneys)
30° or 15°
4
Inspection piece,
straight
5
Balanced flue inspection piece,
straight
6
Balanced flue air inlet adaptor
7
Balanced flue pipe
1 m long
0.5 m long
8
Balanced flue bend
87° or 2 x 45°
or
Balanced flue inspection tee
or
Balanced flue inspection bend
Routing through a shaft
(cont.)
5780 223 GB
Содержание Vitocaldens 222-F
Страница 56: ...56 35 4 35 35 4 Insert screws into the wall in accordance with the pipe length Plume kit cont 5780 223 GB ...
Страница 58: ...58 5780 223 GB ...
Страница 59: ...59 5780 223 GB ...