60
■ The
heat pump control unit/PCB
must be supplied
without
power-OFF;
tariffs that are subject to possible shut-
down must not be used here
■ Protect the power supply to the heat
pump control unit with max. 16 A
■ For accessories and external compo-
nents that are not to be connected to
the heat pump control unit, connect the
power supply with the same phase as
the heat pump control unit; we recom-
mend using the same fuse/MCB.
Connection to the same fuse/MCB
provides additional safety when the
power is switched off. Observe the
power consumption of the connected
consumers
Heat pump control unit power supply (230 V~)
X3
9
16
16
F1 T6,3AH
18
N
L1
8
7
6
N
N
3
1
1
X2
X1
Note
This supply must never be blocked.
■ Max. fuse rating 16 A
■ Standard tariff (no optional economy
tariff with power-OFF)
■ Recommended power cable:
3 x 1.5 mm
2
(5 x 1.5 mm
2
with power-
off by the power supply utility)
Installation sequence
Power supply
(cont.)
5600 950 GB
Содержание Vitocal 222-S
Страница 26: ...26 7 8 6 P301 P501 P303 P302 F6 Installation sequence Installing the internal unit cont 5600 950 GB...
Страница 27: ...27 10 9 11 Installation sequence Installing the internal unit cont 5600 950 GB Installation...
Страница 28: ...28 15 2x 16 17 2x 12 14 18 13 X20 Installation sequence Installing the internal unit cont 5600 950 GB...
Страница 29: ...29 2x 4x 6x 4x 22 21 20 19 Installation sequence Installing the internal unit cont 5600 950 GB Installation...
Страница 89: ...89 Opening programming unit 2 2x 1 3 Troubleshooting Repairs 5600 950 GB Service...
Страница 90: ...90 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5600 950 GB...
Страница 91: ...91 Overview of internal components Internal unit Troubleshooting Repairs cont 5600 950 GB Service...
Страница 142: ...142 5600 950 GB...
Страница 143: ...143 5600 950 GB...