37
1.
2.
3.
2x
C
Liquid line
D
Hot gas line
!
Please note
No contamination (e.g. metal
swarf) or moisture should enter
the copper pipes.
Therefore, hold the pipe open-
ings downwards or temporarily
plug them.
Note
■ The internal unit refrigerant lines are
filled with nitrogen, overpressure
2 bar.
■ If using Euro flanged adaptors, solder
the connections using shielding gas.
Installation sequence
Connecting refrigerant lines
(cont.)
5600 950 GB
Installation
Содержание Vitocal 222-S
Страница 26: ...26 7 8 6 P301 P501 P303 P302 F6 Installation sequence Installing the internal unit cont 5600 950 GB...
Страница 27: ...27 10 9 11 Installation sequence Installing the internal unit cont 5600 950 GB Installation...
Страница 28: ...28 15 2x 16 17 2x 12 14 18 13 X20 Installation sequence Installing the internal unit cont 5600 950 GB...
Страница 29: ...29 2x 4x 6x 4x 22 21 20 19 Installation sequence Installing the internal unit cont 5600 950 GB Installation...
Страница 89: ...89 Opening programming unit 2 2x 1 3 Troubleshooting Repairs 5600 950 GB Service...
Страница 90: ...90 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5600 950 GB...
Страница 91: ...91 Overview of internal components Internal unit Troubleshooting Repairs cont 5600 950 GB Service...
Страница 142: ...142 5600 950 GB...
Страница 143: ...143 5600 950 GB...