39
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
................................................................................................ 40
•
•
3. Switching on the power supply for the fuel cell module
................................................ 41
•
4. Commissioning the system with the commissioning assistant
.................................... 41
•
5. Filling the system separation circuit
................................................................................ 42
•
6. Filling the secondary circuit
.............................................................................................. 44
•
7. Filling the fuel cell module trap
........................................................................................ 46
•
•
•
8. Checking all connections on the heating water side for leaks
•
9. Entering heating contractor contact details
.................................................................... 47
•
10. Commissioning the fuel cell module
................................................................................ 47
•
.............................................................................................. 47
•
12. Changing the gas type on the fuel cell module
............................................................... 48
•
13. Adjusting parameters for the mains monitor (ENS) (country setting)
•
•
14. Filling with distilled water and starting the system
........................................................ 49
•
•
15. Terminating maintenance mode and activating energy manager
................................. 50
•
•
16. Checking the balanced flue system for tightness (annular gap test)
........................... 51
•
17. 5-yearly maintenance of fuel cell module
........................................................................ 52
•
18. 10-yearly maintenance of fuel cell module
...................................................................... 53
•
19. Checking the diaphragm expansion vessel and pressure in the system separation
•
•
20. Check the external diaphragm expansion vessel (heating circuits) and the system
•
•
•
21. Checking the safety valve function
•
•
•
22. Checking the electrical connections for firm seating
•
•
•
23. Checking gas equipment on the fuel cell module for leaks at operating pressure
•
•
24. Checking the combustion quality
..................................................................................... 56
•
•
•
25. Checking the flue system for unrestricted flow and leaks
•
•
•
26. Fitting the front panels (fuel cell module)
........................................................................ 56
•
27. Instructing the system user
.............................................................................................. 56
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5839343
Содержание E00T
Страница 8: ...8 14 Keyword index 95 Index Index cont 5839343 ...
Страница 97: ...97 5839343 ...
Страница 98: ...98 5839343 ...
Страница 99: ...99 5839343 ...