15
■
Connect the power supply (230 V/50 Hz) via a per-
manent connection.
■
Regulations on safety at work and those of appropri-
ate trade associations
■
Low voltage connection ordinances as well as sup-
plementary conditions of the relevant grid operator
■
Any applicable statutory or local regulations
Notify the local grid operator before commissioning the
Vitovalor PA2. We recommend you contact the local
grid operator prior to installation and clarify any techni-
cal points as well as the acceptance procedure. Hand
the relevant application forms as per VDE AR-N 4105
[or local regulations] to the relevant grid operator.
Application forms [for German grid operators] are
available at
Note
Different documentation may be required by grid oper-
ators in other regions.
Metering generated power
A net AC meter (Z2) is integrated into the
Vitovalor PA2. This meter captures total electrical
power generated, minus that consumed by the
Vitovalor PA2 itself. This meter is MID-calibrated and is
licensed for statements to DIN VDE AR-N
4105:2011-08 and the combined heat and power act
(KWKG) (Germany).
The calibration of the integral meter is valid for 8 years.
After expiry of this time, the meter must be recalibrated
or be replaced by a qualified contractor. The power
supply utility must also be notified of any new meter.
Replace any existing main electricity meter installed in
the low voltage distribution board (meter cupboard)
with a balancing bidirectional meter if excess power is
exported to the grid [check local regulations]. The
change of meter with all necessary formalities must be
undertaken by an authorised electrician in agreement
with the grid operator.
Preparing for installation
Notes on connecting to the mains supply
(cont.)
5839343
Installation
Содержание E00T
Страница 8: ...8 14 Keyword index 95 Index Index cont 5839343 ...
Страница 97: ...97 5839343 ...
Страница 98: ...98 5839343 ...
Страница 99: ...99 5839343 ...