56
A
Fig. 44
1.
Connect a flue gas analyser at flue gas port
A
on
the boiler flue connection.
Note
The fuel cell module must be in operation (power
generation) for the measurement.
2.
Check the CO content.
The CO content must be < 100 ppm for all gas
types.
Note
A CO
2
or O
2
test on the fuel cell module is not neces-
sary.
Checking the flue system for unrestricted flow and leaks
Fitting the front panels (fuel cell module)
To fit the front panels: See page 37.
Instructing the system user
The system installer should hand the operating instruc-
tions to the system user and instruct the user in oper-
ating the system.
This includes all components installed as accessories,
e.g. remote control units. In addition, the system instal-
ler must make the user aware of the required mainte-
nance work.
Commissioning, inspection, maintenance
Checking the combustion quality
5839343
Содержание E00T
Страница 8: ...8 14 Keyword index 95 Index Index cont 5839343 ...
Страница 97: ...97 5839343 ...
Страница 98: ...98 5839343 ...
Страница 99: ...99 5839343 ...