20
Fig. 10
1.
Push the supplied drain hose on to the drain con-
nector.
2.
Connect the drain hose with a constant fall and a
pipe vent to the public sewage system or to a neu-
tralising system.
Note
Route the onward drain line inside the building as
far as possible.
If the onward drain line is routed outside the build-
ing:
■
Use a min. Ø 30 mm line.
■
Protect the line from frost.
■
Keep the line as short as possible.
!
Please note
The drain hose is used to route away any
hot water discharged from the safety valve.
Lay and secure the drain hose in a way that
prevents any risk of scalding.
Note
Observe local waste water regulations.
Filling the trap with water
Fig. 11
Pour at least 0.3 l of water into the flue gas connection.
!
Please note
During commissioning, flue gas may escape
from the condensate drain.
Always fill the trap with water before commis-
sioning.
Note
If there is a risk of frost, only fill the trap just before
commissioning.
Flue gas connection
Note
The "System certification" and "Skoberne GmbH flue
system" labels enclosed with the technical documenta-
tion may only be used in conjunction with the
Viessmann flue system made by Skoberne.
Connecting the balanced flue pipe
Flue system installation instructions
Installation sequence
Condensate connection
5593201
Installation
Содержание B2HF
Страница 33: ...33 2 2x 1 Fig 26 Installation sequence Closing the wiring chamber 5593201 Installation ...
Страница 45: ...45 1 2x 1 2 3 2x 2 3 Fig 32 Commissioning inspection maintenance Removing the front panel 5593201 ...
Страница 111: ...111 1 2 4 3 6 5 Fig 56 Troubleshooting Repairs cont 5593201 Diagnosis ...
Страница 134: ...134 WiFi router 31 Wiring diagram 121 Keyword index Keyword index cont 5593201 ...
Страница 135: ...135 5593201 ...