background image

12.2018

 

 

 

INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 / VITTORIA 10

 

 

 

9

 

 

bottom of the chimney must be built manhole allowing opening and cleaning at least once a year. On top of the chimney must be 
installed a wind protection hat, according to current regulations. 

 

 

 

 

 

   

 

 

Picture.3. 

А -Insulated metal chimney. 

В -Minimum height of 1.5 meters beyond the eaves of the roof. 

С -Incoming outside air through the section with minimum cross section of 80 сm

2

Е -Incoming outside air through the section with minimum cross section of 80 cm. 
D -Metal pipe in masonry chimney. 

 

10. Appliance operation. 

10.1. 

Initial ignition

The installer of the pellet stove should perform the initial release! 

The installer is obligated to:  

- to check the dimensions of the connecting flue pipes and chimney; 

- to set the pellet stove according to the type of wood pellets used; 

- to carry out emission control of flue gases after installation; 

- to make a detailed instruction of the user; 

Pellet stove is coated by high temperature resistant paint, but not against corrosion. In case of accumulation of dust, surfaces can 
be cleaned with a soft brush or a dry cloth, but in any case not with a damp cloth or water. 

Upon initial ignition do not place any objects on the pellet stove and do not touch the outer surface to avoid damaging the coating. 
The  flavor,  which  is  obtained  as  a  result  of  the  drying  of  the  paint,  disappears  after  a  few  hours.  Ventilate  the  room  where  is 
located the pellet stove. 

If as a result of overheating or due to incorrect operation color changes, appeared stain rust or damaged part of the coverage, it 
is not a problem. You can order spray paint to your dealer. 

Before ignition, check: power, door seal, if the combustion chamber is cleaned and whether the display is switched to 
standby mode. 

10.2.

Control panel description

After start up, on the control display is shown the logo of Victoria-05 for 3 seconds and then switches to main user panel. The icons 
and functions are shown as follows: 
 

 

Picture.4. 

Содержание VITTORIA 10

Страница 1: ...INSTRUCTION MANUAL for installation and operation of air pellet stove VITTORIA 8 VITTORIA 10...

Страница 2: ...E CONTROL UNIT 10 10 2 3 MAIN MENU 11 10 2 4 INSTALLER SETTINGS 12 10 2 5 SERVICE TECHNICIAN SETTINGS 13 10 3 COLD TEST 14 11 INSTRUCTION MANUAL 14 11 1 WOOD PELLETS LOADING 14 11 2 WOOD PELLET REFUEL...

Страница 3: ...of failure of any of its components Safety components are activated without outside interference Necessary for the proper operating of the pellet stove is its proper installation in accordance with t...

Страница 4: ...Victoria 05 Ltd 4 3 Technical data and dimensions Drawing 1...

Страница 5: ...pellets with calorific value not less than 4300 ccal kg and heat loss of heated room 33 ccal m h Consideration must be given to the availability of external devices that can influence the operation o...

Страница 6: ...outlet and intakes combustion air by vacuum Gear motor Driven auger screw by means of which the pellets are conveyed from the pellet fuel hopper to the combustion chamber Room air fan Ensures additio...

Страница 7: ...from Picture 2 Through the control panel the user can visualize and manage all stages of the operation of the pellet stove 8 Fuel Pellet stove e designed and programmed to burn wood pellets They have...

Страница 8: ...o the timber wall or other inflammable material suitable materials such as ceramic wool should be used to isolate it Fresh air opening Imperative to ensure submission of fresh air The room in which is...

Страница 9: ...after installation to make a detailed instruction of the user Pellet stove is coated by high temperature resistant paint but not against corrosion In case of accumulation of dust surfaces can be clean...

Страница 10: ...appear after the process has been finished If for more than 6 seconds there is no connection to the Control Unit the value will not be saved Day time and night time temperatures To change the require...

Страница 11: ...h Intermediate clean indicates the time left before the system starts cleaning mode Recommended value 600 Pellets indicates the volume of the pellets used during operation mode Input value is gr min D...

Страница 12: ...have to be touched to unlock the display 10 2 4 Installer settings Types of settings for Installer entered with installer password Factory settings Vittoria 8 Vittoria 10 Duration 700 sec 700 sec Fan...

Страница 13: ...s how often the cleaning procedure has to be triggered The set value is summed up from the feed screw working time By this way it s possible to set the cleaning based on the calculation of the amount...

Страница 14: ...me runs out the mode is changed to feeding loading In this mode again a time counter is shown The default time is 70 sec The smoke fan is reducing the power The screw is activated and starts loading i...

Страница 15: ...ny scales that clog the holes Picture 6 Vacuum clean the combustion chamber and all contact edges Clean the glass when it is cold If necessary use appropriate detergent Never vacuum hot coals because...

Страница 16: ...as stopped working Error messages are described below Do not unplug the pellet stove from the main electrical supply during shutdown process In case of failure To restart the pellet stove is necessary...

Страница 17: ...pipes and combustion chamber are clean Flue outlet pipes are clean 15 Frequently Asked Questions The following answers are tentative For more details use the instruction manual What is need to prepare...

Страница 18: ...f the pellet stove has not worked for a long time Can you use other types of fuel than wood pellets NO Pellet stove is designed to work with wood pellets with a diameter of 6 mm The use of another typ...

Страница 19: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 19...

Страница 20: ...Victoria 05 Ltd 20...

Страница 21: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 21...

Страница 22: ...Victoria 05 Ltd 22...

Страница 23: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 23...

Страница 24: ...ass sealing set 11 Combustion chamber set 12 Fire grate 13 Deflector top 14 Handle 15 Fire door set 16 Ashtray 17 Grill for hopper 18 Left side plate set 19 Right side plate set 20 Special tool 21 Dis...

Страница 25: ...the remaining population For other countries please contact you dealer Any warranty repair of the pellet stove is recorded in the diary of warranty Warranty of the pellet stove is NOT VALID in the fol...

Страница 26: ...Victoria 05 Ltd 26 DIARY for repairs under warranty Company Receipt date Type of repair Delivery date Carried out...

Страница 27: ...12 2018 INSTRUCTION MANUAL for installation and operation of pellet stove VITTORIA 8 VITTORIA 10 27...

Страница 28: ...Victoria 05 Ltd 1B Ivan Momchilov Str 5100 Gorna Oryahovitsa Republic of Bulgaria phone 359 618 60282 fax 359 618 60200 e mail info v05 bg http www v05 bg...

Отзывы: