TM-VE414/415MC_38
REV_D
TM-VE414/415MC
/ Operating and Maintenance Instructions Manual
UPPER ROLL INSTALLATION FOR
4 – 16"/114.3 – 406.4 MM SIZES
NOTICE
• Clean the upper shaft of any dirt and/or
scale before installing the upper roll.
• Inspect the roller bearing, inside the
upper roll, for proper lubrication and
condition. Make any repairs, as necessary.
1.
Carefully slide the applicable size upper roll
onto the upper shaft, as shown above, with the
markings facing forward.
2.
Install the upper roll’s retaining plate by
aligning the tab on the plate with the recess in
the slide, as shown above.
3.
Install the upper roll’s retaining bolt, and
securely tighten the bolt with a wrench.
4.
Lubricate the upper roll bearings, as
shown. Refer to the applicable “Recommended
Lubricants” table for the proper grease.
5.
Roll set installation is now complete. Before
grooving, ensure that all instructions in the
previous sections of this manual have been
followed (i.e. adjusting the roll guards, adjusting
the groove diameter stop, etc.).
Содержание VE414MC
Страница 2: ......
Страница 47: ...This page intentionally blank...
Страница 59: ...This page intentionally blank...