5
Site Requirements
The VR9500 can be mounted on a standard equipment rack or placed on a
tabletop.
Before installing the device, verify that the site selected for the device meets the
following requirements:
·
Power — The device is installed within 5ft (1.5m) of a grounded and easily
accessible outlet 220/110VAC, 50/60Hz.
·
General — The power source is correctly installed.
·
Clearance — There is adequate frontal clearance for operator access. Allow
clearance for cabling, power connections, and ventilation.
·
Cabling — Cabling is routed to avoid sources of electrical noise such as radio
transmitters, broadcast amplifiers, power lines, and fluorescent lighting
fixtures.
·
Ambient Requirements — The ambient device operating temperature range is
32° to 122°F (0° to 50°C) at a relative humidity of up to 95%RH, non-
condensing. Verify that water or moisture cannot enter the device case.
·
Do not operate the device near volatile or flammable materials.
Physical Dimensions
Height — 1.75in (44.45mm) (1U)
Width — 15in (381mm) (19in rack mount with included brackets)
Depth — 9.5in (242mm)
Содержание VR9500
Страница 1: ......
Страница 4: ......
Страница 5: ...1 support vibrationresearch com Hardware Overview Front and Back Panel Inputs Outputs ...
Страница 31: ......
Страница 32: ......