Vertiv
|
XTE 802 Series Walk-In-Cabinet (WIC) Description & Installation Manual (631-205-434)
|
Rev. D
56
Figure 23:
Leveling and Securing Corner Plates
5.
Anchoring can occur before or after the WIC is set. See “Concrete Pier Installation Considerations” on
page 55 for anchoring information.
6.
Lift and set WIC on Concrete Mount Foundation Kit. Be sure to bolt the WIC base to the corner plates
prior to releasing all of the weight of the WIC on the corner plates. See “WIC Lifting and Placement
Procedures” starting on page 77.
7.
Once all hardware is installed connecting the WIC base to all corner plates, tighten and secure all the
hardware.
8.
Install the WIC stairs using the provided hardware.