Placing the WIC
On Approved Foundation Kit
Approved Foundation Kits:
•
WIC Helical Foundation Kit
•
WIC Concrete Mount Foundation Kit
•
WIC On the Ground (Gravity) Foundation Kit
•
WIC and Generator Combo Helical Foundation Kit
•
WIC and Generator Combo Concrete/Gravity Foundation Kit
•
Elevated WIC and Generator Platform Kit
The following is a typical guide. Consult your company policies for your specific installation requirements.
Perform the following steps in placing and securing the WIC.
Procedure
ALERT!
During lifting, the WIC must be lowered so that the WIC is level and parallel to the piers. Place
the WIC so that it lines up with the bolt locations and clears any conduits.
1.
Set WIC on foundation kit. Be sure to install and secure provided hardware between WIC base and
foundation kit prior to setting the full weight of the WIC.
2.
Check to be sure the WIC is properly placed.
3.
Loosen the slings or remove forklift so that the full weight of the WIC rests on the foundation kit.
4.
Secure the WIC by bolting it to the mounting plates that are attached to the top of the piers using
appropriate bolting material. Add top washers and nuts to leveling hardware and tighten. See
NOTE!
Each pier has four sets of leveling hardware. Each set of leveling hardware has one threaded
rod and four nuts and washers. Two nuts and washers sandwich the pier top plate and the other two
nuts and washers sandwich the WIC mounting plate.
5.
Verify hardware between WIC base and foundation kit is tight and secure.
6.
Remove the slings, spreader bars, and tagline (if using a crane).
ALERT!
If the WIC will not be powered up for an extended period, place a heat source, such as two 120
VAC 150 W incandescent lamps inside the WIC to prevent condensation. Suspend lamps from cable
racks to prevent contact with any structures or equipment inside the WIC.