6 PIPING REQUIREMENTS
The fluid connections to the unit are threaded and sealed with threaded plugs. Connections are provided at the top and
bottom of the unit.
•
Field installed piping must be installed in accordance with local codes and must be properly assembled,
supported, isolated, and insulated. Avoid piping runs through noise sensitive areas, such as office walls and
conference rooms.
•
Refer to specific text and detailed diagrams in this manual for other unit specific piping requirements.
•
All piping below the elevated floor must be arranged so that it offers the least resistance . Careful planning of
the piping layout under the raised floor is required. When installing piping on the sub-floor, we recommend
installing the pipes in a horizontal plane rather than stacked one above the other. Whenever possible, the pipes
should be run parallel.
•
Place the tubing on supporting saddles.
•
Install shut-off ball valves on the inlet and outlet pipes to ease maintenance.
•
Install optional thermostats and pressure gauges on the inlet and outlet pipes.
•
Install a water drain tap at the lowest point in the circuit.
•
Locate air vents at tops of all risers and any intermediate system high points.
The pipe connection locations, piping general arrangement and schematics are described in the submittal documents
included in the
The following tables list the relevant documents by number and title.
Document Number
Title
DPN004928
Piping Arrangement, Liquid to Air 60 kW 600 mm (24 in.) Model
Table 6.1 Piping General Arrangement Drawings
Document Number
Title
DPN004932
Primary Connection Locations Liquid to Air 60 kW, 600 mm (24 in.) Model
Table 6.2 Piping Connection Drawings
6.1 Fluid Volume for Unit and Connection Piping
The following tables provide the fluid volume requirements for the Liebert® XDU™ Liquid to Air Heat Exchanger for Chip
Cooling and connected piping/hosing.
Fluid Volume
Unit Model
cubic in.
gal, (l)
XDU60
1,412.17 in.
3
6.11 (23)
Table 6.3 Volume of Unit Internal Fluid Circuit
6 Piping Requirements
25
Содержание Liebert XDU 060
Страница 1: ...Liebert XDU Liquid to Air Heat Exchanger for Chip Cooling Installer User Guide 600 mm Wide ...
Страница 10: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 6 This page intentionally left blank ...
Страница 14: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 10 This page intentionally left blank ...
Страница 18: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 14 This page intentionally left blank ...
Страница 38: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 34 ...
Страница 42: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 38 This page intentionally left blank ...
Страница 52: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 48 This page intentionally left blank ...
Страница 56: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 52 This page intentionally left blank ...
Страница 58: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 54 This page intentionally left blank ...
Страница 59: ...Appendix B Performance Curves Figure B 1 Liebert XDU Performance Test Results 45 C 113 F LFT 55 ...
Страница 62: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 58 This page intentionally left blank ...
Страница 64: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 60 This page intentionally left blank ...
Страница 74: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling ...