3 PRE-INSTALLATION PREPARATION AND GUIDELINES
NOTE: Before installing unit, determine whether any building alterations are required to run piping, wiring, and duct
work. Follow all unit dimensional drawings and refer to the submittal engineering dimensional drawings of individual
units for proper clearances.
Refer to
on page 7 and the appropriate submittal drawings to determine the type of system
being installed and anticipate building alterations, piping, and duct work needed.
The unit dimensions, pipe connection locations, and piping schematics are described in the submittal documents included
in the
•
Verify that the floor is level, solid, and sufficient to support the unit. See Table 3.2 below, for unit weights.
•
Confirm that the room is properly insulated and has a sealed vapor barrier.
•
For proper humidity control, keep outside or fresh air to an absolute minimum (less than 5% of total air
circulated in the room).
•
Install the units as close as possible to the largest heat load.
•
Allow at least the minimum recommended clearances for maintenance and service. See the appropriate
submittal drawings for dimensions.
•
We recommend installing an under floor leak detection system. Contact your Vertiv representative for
information.
3.1 Planning Dimensions
The unit and floor stand dimensions are described in the submittal documents included in the
The following table lists the relevant documents by number and title.
Document Number
Title
XDU
DPN004930
Cabinet Dimensional Data Liquid to Air 60kW, 600 mm (24 in.) Model
Floor Stand
DPN004933
Floorstand Dimensional Data 600 mm (24 in.) Model
Table 3.1 Dimension Planning Drawings
3.2 Unit Weights
Domestic Packaging
Export Packaging
Dry Weight, lb (kg)
Ship Weight, lb (kg)
Shipping Dimensions, in. (mm)
Ship Weight, lb (kg)
Shipping Dimensions, in. (mm)
825 (374)
90 x 128 x 97 (2286 x 3251 x 2464)
915 (415)
90.5 x 128.5 x 99 (2299 x 3264 x 2515)
700 (318)
Table 3.2 XDU Shipping Dimensions and Unit Weights
3 Pre-installation Preparation and Guidelines
11
Содержание Liebert XDU 060
Страница 1: ...Liebert XDU Liquid to Air Heat Exchanger for Chip Cooling Installer User Guide 600 mm Wide ...
Страница 10: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 6 This page intentionally left blank ...
Страница 14: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 10 This page intentionally left blank ...
Страница 18: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 14 This page intentionally left blank ...
Страница 38: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 34 ...
Страница 42: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 38 This page intentionally left blank ...
Страница 52: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 48 This page intentionally left blank ...
Страница 56: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 52 This page intentionally left blank ...
Страница 58: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 54 This page intentionally left blank ...
Страница 59: ...Appendix B Performance Curves Figure B 1 Liebert XDU Performance Test Results 45 C 113 F LFT 55 ...
Страница 62: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 58 This page intentionally left blank ...
Страница 64: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling 60 This page intentionally left blank ...
Страница 74: ...Vertiv XDU Liquid to Air Heat Exchanger for Chip Cooling ...