
TABLE OF CONTENTS
1.1 Liebert CW Model-number Nomenclature
2 Pre-installation Preparation and Guidelines
2.2 Connections and System Setup
2.3.1 Cooling, Dehumidification and Humidification
2.4 Shipping Dimensions and Unit Weights
3 Equipment Inspection and Handling
3.2 Handling the Unit while Packaged
3.4 Removing the Unit from the Skid
5.1.1 Field-installed, Gravity-fed Drain Line Requirements
5.1.2 Condensate-pump Drain Line Requirements
5.2 Chilled-water Loop Piping Guidelines
5.2.1 Leak Checking for Unit and Field-installed Piping
6 Checklist for Completed Installation
6.1 Moving and Placing Equipment
6.2 Electrical Installation Checks
6.3 Piping Installation Checks
7 Initial Start-up Checks and Commissioning Procedure For Warranty Inspection
8.2.1 Fan Assembly Troubleshooting
8.2.3 Blower-motor Lubrication
8.3 Condensate-drain and Condensate-pump System Maintenance
Vertiv | Liebert® CW™ Installer/User Guide |
iii
Содержание Liebert CW
Страница 1: ...Liebert CW Thermal Management System Installer User Guide 305 kW 375 kW 415 kW Capacity 50 60 Hz...
Страница 10: ...Vertiv Liebert CW Installer User Guide 6 This page intentionally left blank...
Страница 24: ...Vertiv Liebert CW Installer User Guide 20 This page intentionally left blank...
Страница 32: ...Vertiv Liebert CW Installer User Guide 28 This page intentionally left blank...
Страница 34: ...Vertiv Liebert CW Installer User Guide 30 This page intentionally left blank...
Страница 36: ...Vertiv Liebert CW Installer User Guide 32 This page intentionally left blank...
Страница 46: ...Vertiv Liebert CW Installer User Guide 42 This page intentionally left blank...
Страница 48: ...Vertiv Liebert CW Installer User Guide 44 This page intentionally left blank...
Страница 75: ...Vertiv Liebert CW Installer User Guide...