
3.3 Unpacking the Unit
1. Refer to 3.3 above:
•
On units with domestic packaging, remove the exterior stretch wrap packaging from
around the unit and any protective corner and side packaging planks.
•
On units with export packaging, remove the metal spring clips that secure the top and
side panels of the crate. Then remove the exterior stretch wrap packaging from around
the unit and any protective corner and side packaging planks.
Figure 3.2 Unpacking the Unit
Item
Description
1
Domestic packaging
2
Export packaging
3 Equipment Inspection and Handling
15
Содержание Liebert CW
Страница 1: ...Liebert CW Thermal Management System Installer User Guide 305 kW 375 kW 415 kW Capacity 50 60 Hz...
Страница 10: ...Vertiv Liebert CW Installer User Guide 6 This page intentionally left blank...
Страница 24: ...Vertiv Liebert CW Installer User Guide 20 This page intentionally left blank...
Страница 32: ...Vertiv Liebert CW Installer User Guide 28 This page intentionally left blank...
Страница 34: ...Vertiv Liebert CW Installer User Guide 30 This page intentionally left blank...
Страница 36: ...Vertiv Liebert CW Installer User Guide 32 This page intentionally left blank...
Страница 46: ...Vertiv Liebert CW Installer User Guide 42 This page intentionally left blank...
Страница 48: ...Vertiv Liebert CW Installer User Guide 44 This page intentionally left blank...
Страница 75: ...Vertiv Liebert CW Installer User Guide...