Uponarrival of the unit and before unpacking:
•
Verify that the labeled equipment matches the bill of lading.
•
Carefully inspect all items for visible or concealed damage.
•
Report damage immediately to the carrier and file a damage claim witha copy sent to Vertiv or to your sales
representative.
•
For initial access use a 7/32-in. Allenwrenchfor panel removal.
Equipment Recommended for Handling the Unit:
•
Forklift
•
Pallet jack
•
Piano jacks
•
Lift beam
•
Slings
•
Spreader bars
3.1 Packaging Material
All material used to package this unit is recyclable. Please save for future use or dispose of the material appropriately.
3.2 Handling the Unit while Packaged
ransport the unit witha forklift or pallet jack. If that is not possible, use a crane withslings and spreader bars that are rated
for the weight of the unit.
Whenusing a forklift or pallet jack:
•
Ensure that the fork lengthis suitable for the unit lengthand, if adjustable, spread to the widest allowable
distance that will fit under the skid.
•
Whenmoving the packaged unit, lift the unit from the end withthe indicated labeling, and do not lift the unit
any higher than4 in. (102 mm). Ensure that the opposite end of the skid still touches the floor. The unit must be
pulled by the forklift. All personnel except those moving the unit must be kept 12 ft (3.7 m) or more from the
unit while it is being moved.
•
If the unit must be lifted higher than4 in. (102 mm), all personnel not directly involved inmoving the unit must
be 20 ft (5 m) or farther from the unit.
•
OnCW146 throughCW400 models, Always refer to the locationof the center-of-gravity indicators whenlifting
the unit, see Figure 4.1 below.
Figure 4.1 Center-of-gravity indicator
Vertiv | Liebert® CW™Installer/User Guide
24
Содержание Liebert CW 038
Страница 14: ...Vertiv Liebert CW Installer User Guide 14 Thispageintentionally left blank...
Страница 22: ...Vertiv Liebert CW Installer User Guide 22 Thispageintentionally left blank...
Страница 38: ...Vertiv Liebert CW Installer User Guide 38 Thispageintentionally left blank...
Страница 44: ...Figure 7 2 Lowering EC fans into floor steps 8 through 9 Vertiv Liebert CW Installer User Guide 44...
Страница 80: ...Vertiv Liebert CW Installer User Guide 80 Thispageintentionally left blank...
Страница 102: ...Vertiv Liebert CW Installer User Guide 102 Thispageintentionally left blank...
Страница 105: ...2 Check contactorsfor pitting Replaceifpitted 3 Check Re torquewireconnections 11 PreventiveMaintenanceChecklist 105...
Страница 108: ...Vertiv Liebert CW Installer User Guide 108 Thispageintentionally left blank...
Страница 167: ...Vertiv Liebert CW Installer User Guide...