![Vertiv Liebert CW 038 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/vertiv/liebert-cw-038/liebert-cw-038_installer-and-user-manual_1008217019.webp)
2.4 Air-distribution Considerations for Upflow Units
Various configurations are available:
•
Front return
•
Rear return
•
Bottom return(not available onCW106 and CW114 models)
For in-room applications withsupply and returngrilles, several feet of clearance must be maintained at the intake and
discharge of the unit.
Upflow rear-returnconfigurations use a filter box attached to the back of the unit. Allow25 in. (635 mm) onone side of the
unit for access to the rear-returnfilter box. Refer to the rear-returninstallationsheet, inside the rear-returnfilter box
package.
For ducted applications, duct flanges are supplied onthe blower outlets. Followthe SMACNA-Duct ConstructionStandard
for single-, dual-, or triple-blower systems. Do not runduct work off the perimeter flange onthe top of the unit. This flange is
for positioning and attaching the optional air discharge plenum withgrille. Attaching a duct to this flange may reduce
airflowto inadequate levels.
Figure 3.2 Upflow ducting configurations (forward-curved blowers)
Item
Description
1
Typical ducting
2
Straight sectionsmust be 1.5to2.5timesthe longest blowerdimension.
3
Front of unit
NOTE: Drain traps are qualified to a return duct static of negative 1.5 i.w.g. (-1.5 i.w.g).
2 Pre-installation Preparation and Guidelines
19
Содержание Liebert CW 038
Страница 14: ...Vertiv Liebert CW Installer User Guide 14 Thispageintentionally left blank...
Страница 22: ...Vertiv Liebert CW Installer User Guide 22 Thispageintentionally left blank...
Страница 38: ...Vertiv Liebert CW Installer User Guide 38 Thispageintentionally left blank...
Страница 44: ...Figure 7 2 Lowering EC fans into floor steps 8 through 9 Vertiv Liebert CW Installer User Guide 44...
Страница 80: ...Vertiv Liebert CW Installer User Guide 80 Thispageintentionally left blank...
Страница 102: ...Vertiv Liebert CW Installer User Guide 102 Thispageintentionally left blank...
Страница 105: ...2 Check contactorsfor pitting Replaceifpitted 3 Check Re torquewireconnections 11 PreventiveMaintenanceChecklist 105...
Страница 108: ...Vertiv Liebert CW Installer User Guide 108 Thispageintentionally left blank...
Страница 167: ...Vertiv Liebert CW Installer User Guide...