3.5.1 Tower Installation
1. With the UPS in the installation location, adjust the leveling feet to secure its position, as shown
a. Use an open end wrench to turn the lower nut to raise or lower the leveling foot.
b. After the unit is level, tighten the upper nut against the frame to prevent the height from
changing.
Figure 3.3 Adjust the leveling feet
ITEM
DESCRIPTION
1
Upper nut
2
Lower nut
Vertiv
| Liebert® APS™ Installer/User Guide |
25
Содержание Liebert APS series
Страница 1: ...Liebert APS 5 20 kVA Modular UPS Installer User Guide...
Страница 6: ...Vertiv Liebert APS Installer User Guide 6...
Страница 10: ...Vertiv Liebert APS Installer User Guide 10 This page intentionally left blank...
Страница 50: ...Vertiv Liebert APS Installer User Guide 50 This page intentionally left blank...
Страница 76: ...Vertiv Liebert APS Installer User Guide 76 This page intentionally left blank...
Страница 80: ...Vertiv Liebert APS Installer User Guide 80 This page intentionally left blank...
Страница 109: ......