To connect the cable:
NOTE: Input and output cables must be run in separate conduit before cable connection.
1. Remove the knockouts at the junction box, see Figure 3.22 below, and pull the cables through
them, leaving some slack for installation.
Figure 3.22 Knockouts in Units without Transformer
ITEM
DESCRIPTION
ITEM
DESCRIPTION
1
16-bay, no transformer
3
Output-cable knockout
2
10-bay, no transformer
4
Input-cable knockout
2. Connect the cables to the corresponding terminal of the power input and output terminals.
3. Using a 13-mm (1/2-in.) torque wrench, tighten the screws to 4.52 Nm (40 in-lb).
4. Respectively, secure the conduit of the input/output cables through the cable bridges on the
rear panel of the UPS, see Figure 3.23 below.
Figure 3.23 Secure cables on cable bridges
ITEM
DESCRIPTION
1
Cable bridge
The connection methods for single-phase and the 3-phase input modes are shown in 3.7.3 on page 41
and 3.7.3 on page 41, respectively. Installation of the factory-provided copper bar is essential in the
single-phase input mode. The copper busbar is in the accessory bag included with the UPS.
Vertiv
| Liebert® APS™ Installer/User Guide |
43
Содержание Liebert APS series
Страница 1: ...Liebert APS 5 20 kVA Modular UPS Installer User Guide...
Страница 6: ...Vertiv Liebert APS Installer User Guide 6...
Страница 10: ...Vertiv Liebert APS Installer User Guide 10 This page intentionally left blank...
Страница 50: ...Vertiv Liebert APS Installer User Guide 50 This page intentionally left blank...
Страница 76: ...Vertiv Liebert APS Installer User Guide 76 This page intentionally left blank...
Страница 80: ...Vertiv Liebert APS Installer User Guide 80 This page intentionally left blank...
Страница 109: ......