Vertiv
|
+24 VDC Power System User Manual (Section 6013)
|
Rev. G
201
7.
Reconnect the Contactor Assembly linking busbar to the system busbar as shown at SYSTEM BUSBAR
CONNECTION in
. Tighten the bolts as specified in the figure.
8.
Reconnect all battery wiring to the Contactor Assembly input busbar. Refer to the separate
INSTALLATION INSTRUCTIONS (SECTION 6012) for connection locations and recommended torque.
Restarting the Power System
1.
Reconnect DC and AC power to Power System.
2.
Start the Power System. Refer to "Installing Rectifier Modules and Initially Starting the System" in the
separate INSTALLATION INSTRUCTIONS (SECTION 6012) for a startup procedure.
3.
Verify no alarms are active.
4.
Close the Distribution Cabinet's front door. The door can be shut without turning the captive fasteners.