STEP 11 Cont.: Place the left stove end firmly into its mating channel in the stove front,
swing the back of the end onto the stove bottom so that the drilling in the
inside bottom flange of the end aligns with the tapped hole in the stove
bottom. Secure the end to the bottom and the end to the front with 2 each,
hex head cap screws (¼-20 x ¾”) and 2 each, standard flat washers (¼”).
STEP 12:
Cement channels and mating surfaces as indicated in Figure
C-6. Place the right stove end firmly into its mating channel
in the stove front, swing the back of the end onto the stove
bottom so that the drilling in the inside bottom flange of the
end aligns with the tapped hole in the stove bottom. Secure
the end to the bottom and the end to the front with 2 each,
hex head cap screws (¼-20 x ¾”) and 2 standard flat
washers (¼”).
Fig. C-6
Right End
STEP 13:
Place the stove back onto its cemented channel in the stove bottom, push
the back against its mating surfaces on the right and left stove ends
aligning drillings in the stove back with their corresponding tapped holes
in the stove ends. If alignment cannot be achieved, loosen the cap screws
securing the stove ends to the bottom and the ends to the front and tap the
entire assembly into proper alignment with the rubber mallet. When
alignment is achieved, secure the back to the stove ends with 6 each, hex
head cap screws (¼-20 x ¾”) and 6 each, standard flat washers (¼”).
Retighten the cap screws securing the ends to the bottom and the ends to
the stove front.
STEP 14:
Cement channels and mating surfaces on the underside of the stove top as
indicated in Figure C-8. Place the top in position on the stove front, ends,
and back insuring that a good all around seal
is achieved. Use the rubber mallet as
necessary. Secure the top to the stove front
with 1 each, Phillips flat head machine
screw (¼”-20 x ¾”). Secure the top to the
rear of the stove ends with 2 each, hex head
cap screws (¼”-20 x ¾”) and 4 each,
standard flat washers (¼”) 2 per cap screw.
Fig. C-8
Top (bottom view)