STEP 8:
Cement all channels, flanges and mating surfaces indicated in Figure C-2.
Do not allow any cement to contact the thermostat cable. Place the
primary air tube cover plate in position on the stove bottom and secure
with 3 each, Phillips flat head machine screws (¼-20 x 2”).
Fig. C-2
Bottom (top view)
STEP 9:
Place the stove front in its cemented channel on the stove bottom (Figure
C-3) and secure with 1 each, hex head cap screw ( ¼”-20 x 1”) and 1 each,
hex lock nut ( ¼-20) centre bottom of the stove front.
Fig. C-3
Bottom with Air Tube Cover
Fig. C-4
Front
Plate in Place
STEP 10:
Cement all mating surfaces on the stove front as indicated in Figure C-4.
Place the front air manifold in position on the inside of the stove front and
secure with 1 each, hex head cap screw (¼-20 x 2”).
STEP 11:
Cement mating grooves on both ends of the front air manifold as indicated
in Figure C-7. Cement channels and mating surfaces on the left stove end
as indicated in Figure C-5.
Fig. C-5
Left End
Fig. C-7
Front Air Manifold