STEP 6:
Inspect the kaowool strips in the lower fireback and the bottom of the
stove back. If the kaowool strips are compressed below the top edge of
the inside ribs of either the lower fireback or the stove back, replace them.
The kaowool strips when in place must provide a complete seal as well as
a cushion for the refractory package.
STEP 7:
Clean all old furnace cement from the bottom flange of the stove back and
the stove back and the stove back cement channel in the stove bottom.
STEP 8:
Re-gasket the stove back. Refer to the gasketing section of this manual for
instructions. Fill the stove back cement channel in the stove bottom with
thermocement.
STEP 9:
Place the refractory package into the stove back. Place the right and left
heat deflectors into their proper positions in the stove back.
STEP 10:
Install the stove back.
Replacing the Secondary Air Thermostat, Flap and Linkage
Tools Required
Screwdriver, Phillips, # 2 tip.
Refer to step 30 of the disassembly section of this manual and steps 31 and 32 of the
assembly section of this manual.
Eliminating Air Leaks at the Ash Door
Tools Required
•
7/16” Combination Wrench (box
& open)
•
Ratchet Handle, 3/8” drive
•
Extension, 3”, 3/8” drive
•
7/16” Socket, 3/8” drive
•
9/16” Socket, 3/8” drive
•
1/8” Allen Wrench
•
Rubber Mallet, 4 lbs. dead blow
•
Wire Brush
R e f e r t o s t e p s 3 3 t h r u 3 5 o f t h e a s s e m b l y s e c t i o n o f t h i s m a n u a l .