Fitting Type 1 - Bayonet
l
Mount the lens and camera assembly (fig 5b) onto the camera mounting bracket as
shown in fig 5e and 5f.
l
Rotate the lens and camera assembly anti-clockwise to locate in position. The socket
head screws are fixed in position and do not require tightening.
l
Ensure that the camera is in a horizontal position.
l
To rotate the camera independently of the lens, hold the camera firmly in position
and use a 1.25 mm Allen key to loosen the three grub screws positioned around the
adapter ring as shown in fig 5b, and position the camera horizontally.
l
Once the camera is in the correct position, tighten the three grub screws and release
the camera.
l
Connect the Ethernet cable from the front of the door arm to the Ethernet socket on
the rear of the camera. See fig 11a.
Fitting Type 2 - Screw
l
Mount the lens and camera assembly onto the camera mounting bracket as shown
in fig 5e and 5f.
l
Secure the camera assembly in place with the four nuts and socket head screws
provided.
l
Screw the nuts onto the screw threads by hand, then hold them in place using an 8
mm spanner.
l
Tighten the screws using a 3 mm Allen key.
l
To adjust the positioning of the camera, loosen the outer screws to allow vertical
movement, or the inner screws to allow movement horizontally.
Horizontal and Vertical Adjustment
Securing Camera Assembly
3.9.1
Camera and Lens Settings
1. The camera settings are pre adjusted in the software to give the best image qual-
ity and should not need any additional further adjustment.
2. The lens is manually adjusted to give the best quality picture in the following way:
l
Focusing ring on the front of the lens, see fig 5b.
l
Aperture adjustment, see fig 5b. The ideal position for the aperture is at f16. At this
position exposure will be maintained between 450 °C (with rear lighting) and 1600
°C. If a specific test temperature range is be utilised i.e. maximum temperature set
19
Содержание CARBOLITE GERO CAF G5
Страница 63: ...Fig 3 Front Tube Seal Assembly Fig 4 Door Arm Assembly 63 ...
Страница 64: ...Fig 5a Camera Mounting Bracket Fig 5b Lens and Camera Assembly 64 ...
Страница 65: ...Fig 5c Sliding the Camera Mounting Bracket Assembly onto the Door Arm 65 ...
Страница 66: ...Fig 5d Securing the Camera Mounting Bracket Assembly to the Door Arm 66 ...
Страница 67: ...Fig 5e Mounting the Lens and Camera Assembly 67 ...
Страница 68: ...Fig 5f Lens and Camera Assembly in Position 68 ...
Страница 69: ...Fig 6a Rear View of the Standard CAF G5 Furnace Showing Brick Box Assembly 69 ...
Страница 70: ...Fig 6b Rear View of the CAF G5 Biomass Furnace with Rear Illumination Showing Brick Box Assembly 70 ...
Страница 71: ...Fig 7 Front Tube Seal Position 71 ...
Страница 72: ...Fig 8 Tube End Seal Assembly Tightening Sequence Fig 9 Work Tube Front Support 72 ...
Страница 73: ...Fig 10 Fitting the Door Arm Assembly Fig 10a Adjusting the Door Arm Assembly 73 ...
Страница 74: ...Fig 11a Furnace Case and Controls 74 ...
Страница 75: ...Fig 11b Gas Inlet Pipe Fig 12 Positioning the Furnace 75 ...
Страница 76: ...Fig 13a Positioning Samples on the Sample Carrier Fig 13b Loading Samples into the Mouth of the Work Tube 76 ...
Страница 77: ...Fig 13c Loading Samples into the Work Tube 77 ...
Страница 78: ...Fig 16 File Folder 78 ...
Страница 79: ...Fig 17 Door Arm Assembly Exploded View 79 ...
Страница 82: ...SST DT HT FT Fig 18 Report Sheet Page 2 Side View Plan View Fig 19 Formed Wire Sample 82 ...
Страница 83: ...Fig 20 Sample Carrier Sample Tiles and Sample Positions 83 ...
Страница 84: ...Fig 21a Coal and Coke Test Piece Mould Fig 21b Biomass Test Piece Mould and Hand Press 84 ...
Страница 85: ...Fig 22 Sample Loading Tool Fig 23 Camera Ethernet Connection 85 ...
Страница 86: ...Fig 24 LED Driver Connection 86 ...
Страница 87: ...Notes Service Record Engineer Name Date Record of Work ...