VENCO VCFI Series Скачать руководство пользователя страница 12

Safety Retention Cable Installation

IMPORTANT: 

Do not put excessive tension on the 

safety retention cable during installation. The safety 
retention cable should be installed with a small amount 
of slack in the cable to ensure proper functioning. Do 
not allow the safety retention cable to contact any sharp 
edges.

NOTE: 

Failure to install the safety retention cable will 

result in voiding of the fan warranty. 

Standard Steel Cable Clamp

The following instructions apply to standard fan 
installations. For fans that were supplied with optional 
Gripple

®

 hardware, refer to the instructions on page 13.

Components required from Bag # 916290:
  •  U-Bolt Steel Cable Clamp (2)
Hardware/Tools Needed (Not Included):
  •  Torque Wrench
  •  7/16 in. Socket and Wrench
  •  Cable Cutters (optional)

  1.  From the top of the downtube, pull the safety 

retention cable until it is taut inside the downtube.

  2.  Wrap the loose end of the safety cable around 

the mounting structure. Do not allow the cable to 
come in contact with any sharp edges.

  3.  Align the loose end of the safety cable (referred to 

as the dead-end) with the length of cable that is 
wrapped around the mounting structure (referred 
to as the live-end). 

  4.  Attach the dead-end of the safety cable to the live-

end using the supplied 0.188 in. u-bolt steel cable.

IMPORTANT: 

The first steel cable clamp must be 

installed a minimum of 5-1/2 in. away from the dead-
end of the safety cable to ensure proper functioning.

IMPORTANT: 

Steel cable clamps are composed of two 

parts: the u-bolt and the saddle. Steel cable clamps 
must be installed with the u-bolt over the dead-end 
of the safety retention cable and the saddle over the 
live-end of the safety cable. Failure to install steel 

Modbus Address Settings - Dipswitch 3

Modbus 

Address

Position 

1

Position 

Position 

3

Position 

4

Position 

5

Position 

6, 7, 8

2

On

Off

Off

Off

Off

Do Not 

Modify

3

Off

On

Off

Off

Off

4

On

On

Off

Off

Off

5

Off

Off

On

Off

Off

6

On

Off

On

Off

Off

7

Off

On

On

Off

Off

8

On

On

On

Off

Off

9

Off

Off

Off

On

Off

10

On

Off

Off

On

Off

11

Off

On

Off

On

Off

12

On

On

Off

On

Off

13

Off

Off

On

On

Off

14

On

Off

On

On

Off

15

Off

On

On

On

Off

16

On

On

On

On

Off

17

Off

Off

Off

Off

On

18

On

Off

Off

Off

On

19

Off

On

Off

Off

On

20

On

On

Off

Off

On

21

Off

Off

On

Off

On

22

On

Off

On

Off

On

23

Off

On

On

Off

On

24

On

On

On

Off

On

25

Off

Off

Off

On

On

26

On

Off

Off

On

On

27

Off

On

Off

On

On

28

On

On

Off

On

On

29

Off

Off

On

On

On

High Volume, Low Speed Ceiling Fans

12

Содержание VCFI Series

Страница 1: ...tandards including fire rated construction 2 When cutting or drilling into wall or ceiling do not damage electrical wiring and other hidden utilities WARNING This appliance can be used by children age...

Страница 2: ...e Protection Agency NFPA where applicable Follow the Canadian Electric Code CEC in Canada 2 The rotation of the impeller is critical It must be free to rotate without striking or rubbing any stationar...

Страница 3: ...nal use consider using Tectyl 511M Rust Preventive WD 40 or the equivalent Removing from Storage As fans are removed from storage to be installed in their final location they should be protected and m...

Страница 4: ...d location of the fan s 10 Before installation it is important to verify that the mounting surface will bear the operating weight and maximum torque twisting force of the unit The Structural Engineer...

Страница 5: ...INGLET POWER CABLE PLUG OPTIONAL LIGHT POWER CABLE OPTIONAL SAFETY CABLE WITH NO 4 GRIPPLE FACTORY INSTALLED VFD FIRE ALARM LANDING POINT COMMUNICATION CABLE WITH RJ45 SPLITTER LIGHT POWER PLUG OPTION...

Страница 6: ...BE MOUNT ASSEMBLY HEX BOLT I Beam Clamping Plate 2 I Beam Clamping Plate Shim 2 I BEAM CLAMPING PLATE I BEAM CLAMPING PLATE SHIM UNIVERSAL MOUNTING PLATE 1 2 in WASHER 1 2 in 13 GRADE 8 NYLON LOCKNUT...

Страница 7: ...o one side of the I beam and tighten hardware until the universal mounting plate is snug against the beam but can still be moved approximately 1 4 in of the bolt threads exposed below the nylon locknu...

Страница 8: ...Kit For Beams 4 1 2 8 7 8 in Wide Components required from Bag 915429 Wood Beam Bracket 2 1 2 in 13 x 1 1 2 in Grade 8 Hex Bolt 4 1 2 in 13 Grade 8 Nylon Locknut 8 1 2 in Washer 16 Hardware Tools Nee...

Страница 9: ...STEEL ANGLES BY OTHERS 1 2 in 13 x 1 3 4 in GRADE 8 HEX BOLT Z PURLIN 1 2 in WASHER Z PURLIN BRACKET 1 2 in 13 GRADE 8 NYLON LOCKNUT TORQUE TO 80 FT LBF 108 5 N m TORQUE TO 80 FT LBF 108 5 N m 5 Using...

Страница 10: ...motor hub assembly to their corresponding female connectors in the downtube DOWNTUBE AND MOUNT ASSEMBLY MOTOR HUB ASSEMBLY LIGHT POWER PLUG OPTIONAL LIGHT COMMUNICATION PLUG OPTIONAL LIGHT POWER PLUG...

Страница 11: ...1 5 on dipswitch 3 to set the desired Modbus address A table with all possible Modbus addresses is shown to the right IMPORTANT Positions 6 8 are used to set parameters needed for fan operation and sh...

Страница 12: ...e mounting structure referred to as the live end 4 Attach the dead end of the safety cable to the live end using the supplied 0 188 in u bolt steel cable IMPORTANT The first steel cable clamp must be...

Страница 13: ...Insert the loose end of the safety cable into the No 4 Gripple connector Note that the cable will only feed through the Gripple connector in one direction marked on the Gripple connector with an arrow...

Страница 14: ...ing IMPORTANT Steel cable clamps consist of two parts the u bolt and the saddle Steel cable clamps must be installed with the u bolt over the dead end of the guy wire and the saddle over the live end...

Страница 15: ...e that the fan is level in all directions 5 Cut or organize excess guy wires to ensure that they do not interfere with fan rotation NOTE If necessary the guy wires can be loosened by inserting the lon...

Страница 16: ...on locknuts per blade as shown below Hand tighten hardware 5 16 in WASHER 2 PER BLADE 5 16 in 18 GRADE 8 NYLON LOCKNUT 2 PER BLADE MOTOR HUB ASSEMBLY 5 16 in 18 x 2 in GRADE 8 HEX BOLT 2 PER BLADE MOT...

Страница 17: ...b retention bracket Install 4 1 4 in 20 x 3 4 in grade 5 hex bolts into the u nuts Torque to 96 in lbf 10 8 N m LIGHT POWER PLUG HUB COVERING PLATE HUB RETENTION BRACKET U NUT LIGHT BRACKET LIGHT POWE...

Страница 18: ...Communication Wiring Fan Control Installation IMPORTANT VCFI fans must be installed with the supplied CAT 5e communication cable or shielded CAT 5e by others that complies with the following specifica...

Страница 19: ...shock or serious injury DANGER Pour carter les risques d incendie de choc lectrique ou de blessure grave veiller toujours d brancher verrouiller et tiqueter la source de courant avant l installation...

Страница 20: ...d will match the models shown Install fuses per the manufacturer s recommendation Be sure to follow all national and local codes for electrical installation Fuse Sizing Chart VCFI 3 8 to 24 ft VCFI 6...

Страница 21: ...egulations and have experience with this type of equipment Once the fan has been put into operation a periodic maintenance program should be set up to ensure reliable fan performance A proper maintena...

Страница 22: ...nd fasteners for tightness Check guy wire tension if applicable Defective motor Replace motor Defective variable frequency drive VFD Replace VFD Fan does not operate Electrical supply Check for switch...

Страница 23: ...xxx 0 1000 RMS Modulated Output Voltage Volts 1 units 16 Current Motor RMS R xx x 0 150 RMS Motor current Amps 0 1 units 17 Temperature Motor R S xxx x 300 1100 Motor Temp C 0 1 units 18 Temperature T...

Страница 24: ...____________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _____...

Отзывы: