Series 65
INSTALLATION
982156EB
Edition 2019-06-05
59/110
1.2
Optimizing P gain
WE start by setting the P gain to 1.0 as a trial value and adjust according to the response.
The pump down routine has to be controlled as follows:
Move control valve into close position
Start pump down by opening the pump isolation valve or starting the pump and sending the first pressure
set point to the valve controller. With the example above, the first pressure set point is 510 Torr.
At each new interval (exceeding 10 sec) send the new pressure set point.
Repeat until process pressure is achieved.
While pumping down chamber pressure and valve position should be data logged to compare the actual
pump down curve with the ideal straight pump down line.
If the pressure follows the ideal pump down line with significant delay, the P gain is too low.
If the pressure oscillates around the ideal pump down line or if the valve position oscillates, P gain is too
high.
P gain is optimized if the pressure follows the ideal pump down line closely and the valve position is not
oscillating at all.
Example:
Содержание 653 AQ Series
Страница 21: ...Series 65 INSTALLATION 982156EB Edition 2019 06 05 21 110 Controller...
Страница 56: ...INSTALLATION Series 65 56 110 Edition 2019 06 05 982156EB Example...
Страница 109: ...Series 65 APPENDIX 982156EB Edition 2019 06 05 109 110 13 Appendix No information entered on time...
Страница 110: ...Series 65 110 110 Edition 2019 06 05 982156EB This page left blank intentionally...