INSTALLATION
Series 65
20/110
Edition 2019-06-05
982156EB
Mount valve to a clean system only.
4.2.1
Installation space condition
Install the valve with integrated controller with space for dismantling and air circulation
as shown in figure below.
4.2.2
Connection overview
System:
1
Valve
2
Process chamber
3
Gas inlet
4
Pressure sensor(s)
5
Sensor cable(s)
6
Controller and actuator
7
Cable to remote control unit
8
Cable to power supply
9
Pump
M
3
4
5
7
8
2
1
9
6
100 mm
50 mm
Содержание 653 AQ Series
Страница 21: ...Series 65 INSTALLATION 982156EB Edition 2019 06 05 21 110 Controller...
Страница 56: ...INSTALLATION Series 65 56 110 Edition 2019 06 05 982156EB Example...
Страница 109: ...Series 65 APPENDIX 982156EB Edition 2019 06 05 109 110 13 Appendix No information entered on time...
Страница 110: ...Series 65 110 110 Edition 2019 06 05 982156EB This page left blank intentionally...