8.7.7
Checking the connections
Once the energy storage system has been installed and
connected, it is necessary to check whether the system signals a
current flow in all three phases (plausibility).
Return to the welcome page and click on the
System
tab.
Check the measured values for I Grid for plausibility.
An error has occurred if the value for I Grid hovers
b0.01 and 0.01 at all three phases. Check the
cable connection to the current sensor.
Note:
The system may need to have a large load at all three
phases.
Содержание element 6
Страница 1: ...INSTRUCTION MANUAL VARTA element 3 VARTA element 6 VARTA Storage GmbH ...
Страница 58: ...58 Subject to alteration Updated 11 2015 Figure 18 Installing the battery module s ...
Страница 113: ...Subject to alteration Updated 11 2015 A 1 Attachment Attachment 1a Connection diagram of the TN system ...
Страница 114: ...Subject to alteration Updated 11 2015 A 2 Attachment 1b Connection diagram of the TT system ...
Страница 115: ...Subject to alteration Updated 11 2015 A 3 Attachment 2a Connection diagram of the TN system with data logger ...
Страница 116: ...Subject to alteration Updated 11 2015 A 4 Attachment 2b Connection diagram of the TT system with data logger ...
Страница 117: ...Subject to alteration Updated 11 2015 A 5 Attachment 3a EC Declaration of Conformity VARTA element 3 ...
Страница 118: ...Subject to alteration Updated 11 2015 A 6 Attachment 4b EC Declaration of Conformity VARTA element 6 ...