102
Subject to alteration!
Updated 11/2015
Use the handles to pull the battery module forward onto
the rails.
Lift the battery module out of the storage cabinet.
Installing battery modules
Reinstall the battery modules in reverse order.
Make sure that the battery modules are
switched off and no LED indicator is lit.
Following installation, switch on the master module.
11.3.5 Replacing/cleaning the air filter
Unscrew the filter holder.
Aid:
Torx 25 screwdriver
The air filter can be removed.
Clean the area around the filter with a cloth.
Clean the air filter with a vacuum cleaner if necessary.
Make sure no dust from the air filter gets inside
the storage system.
Replace the air filter (at every second service) and re-
mount the filter holder.
Содержание element 6
Страница 1: ...INSTRUCTION MANUAL VARTA element 3 VARTA element 6 VARTA Storage GmbH ...
Страница 58: ...58 Subject to alteration Updated 11 2015 Figure 18 Installing the battery module s ...
Страница 113: ...Subject to alteration Updated 11 2015 A 1 Attachment Attachment 1a Connection diagram of the TN system ...
Страница 114: ...Subject to alteration Updated 11 2015 A 2 Attachment 1b Connection diagram of the TT system ...
Страница 115: ...Subject to alteration Updated 11 2015 A 3 Attachment 2a Connection diagram of the TN system with data logger ...
Страница 116: ...Subject to alteration Updated 11 2015 A 4 Attachment 2b Connection diagram of the TT system with data logger ...
Страница 117: ...Subject to alteration Updated 11 2015 A 5 Attachment 3a EC Declaration of Conformity VARTA element 3 ...
Страница 118: ...Subject to alteration Updated 11 2015 A 6 Attachment 4b EC Declaration of Conformity VARTA element 6 ...