Subject to alteration! Updated 11/2015
49
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
8.3.3
Current sensor
NOTICE!
Disruption to the charge and discharge
function of the energy storage system due to
interchanged phases!
Phases L1, L2, L3 must be identical for building
connection, current sensor and terminal block.
Executing the connection purely as a right-hand
phase rotation is not sufficient.
For the own consumption optimisation mechanism to function, the
current sensor must record all consumption and feed values. The
sensor is therefore located immediately behind the consumption
and feed meter.
Figure 12: Current sensor - direction of installation
Содержание element 6
Страница 1: ...INSTRUCTION MANUAL VARTA element 3 VARTA element 6 VARTA Storage GmbH ...
Страница 58: ...58 Subject to alteration Updated 11 2015 Figure 18 Installing the battery module s ...
Страница 113: ...Subject to alteration Updated 11 2015 A 1 Attachment Attachment 1a Connection diagram of the TN system ...
Страница 114: ...Subject to alteration Updated 11 2015 A 2 Attachment 1b Connection diagram of the TT system ...
Страница 115: ...Subject to alteration Updated 11 2015 A 3 Attachment 2a Connection diagram of the TN system with data logger ...
Страница 116: ...Subject to alteration Updated 11 2015 A 4 Attachment 2b Connection diagram of the TT system with data logger ...
Страница 117: ...Subject to alteration Updated 11 2015 A 5 Attachment 3a EC Declaration of Conformity VARTA element 3 ...
Страница 118: ...Subject to alteration Updated 11 2015 A 6 Attachment 4b EC Declaration of Conformity VARTA element 6 ...