Subject to alteration! Updated 11/2015
65
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
Figure 22:
On/Off
button
The initialisation process can be tracked at the LED ring of the
On/Off
button (see also Table 7):
Flashes green every second: System check (duration:
approx. 90 s).
Steady green light: The storage system is ready
(duration: approx. 60 s).
Steady red light: Probable error = the battery modules
have not yet been configured.
Continue with commissioning.
Note:
If the LED ring fails to respond, check the following:
On/Off
button correctly latched?
Fuses connected?
Grid connection correct?
Door contact switch not damaged?
Содержание element 6
Страница 1: ...INSTRUCTION MANUAL VARTA element 3 VARTA element 6 VARTA Storage GmbH ...
Страница 58: ...58 Subject to alteration Updated 11 2015 Figure 18 Installing the battery module s ...
Страница 113: ...Subject to alteration Updated 11 2015 A 1 Attachment Attachment 1a Connection diagram of the TN system ...
Страница 114: ...Subject to alteration Updated 11 2015 A 2 Attachment 1b Connection diagram of the TT system ...
Страница 115: ...Subject to alteration Updated 11 2015 A 3 Attachment 2a Connection diagram of the TN system with data logger ...
Страница 116: ...Subject to alteration Updated 11 2015 A 4 Attachment 2b Connection diagram of the TT system with data logger ...
Страница 117: ...Subject to alteration Updated 11 2015 A 5 Attachment 3a EC Declaration of Conformity VARTA element 3 ...
Страница 118: ...Subject to alteration Updated 11 2015 A 6 Attachment 4b EC Declaration of Conformity VARTA element 6 ...