Subject to alteration! Updated 11/2015
29
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
(2) Discharge power of the battery inverter in Watt
(W):
The energy storage system is discharged to this
power.
(3) Power of the grid supply/grid draw (W):
The power
supplied into the public grid or drawn from the public grid
is displayed.
(4) Operating state of the energy storage system:
The
operating state, e.g.
Standby
,
Operating
,
Passive,
is
displayed.
(5) The state of charge of the energy storage system
in %:
The charge level of the energy storage system is
displayed.
(6) WWW:
Indicates whether the energy storage system
is connected to the VARTA server (green = online, red =
offline).
(7) i:
Displays information about the storage system, e.g.
IP address, energy counter or the most recent grid fault.
To see further explanations, move the cursor over the symbols.
4.3.3
Ext. relay (optional)
Up to four external relays can be individually programmed for
controlling special functions, including switching loads or
generating units on and off. Clicking the
Ext. relay
button shows
the corresponding page.
This function is optional. A download available from www.varta-
storage.com provides further information.
4.3.4
Portal (optional)
The www.varta-storage-portal.com portal serves to monitor and
visualise the VARTA element 3 / element 6 energy storage
Содержание element 6
Страница 1: ...INSTRUCTION MANUAL VARTA element 3 VARTA element 6 VARTA Storage GmbH ...
Страница 58: ...58 Subject to alteration Updated 11 2015 Figure 18 Installing the battery module s ...
Страница 113: ...Subject to alteration Updated 11 2015 A 1 Attachment Attachment 1a Connection diagram of the TN system ...
Страница 114: ...Subject to alteration Updated 11 2015 A 2 Attachment 1b Connection diagram of the TT system ...
Страница 115: ...Subject to alteration Updated 11 2015 A 3 Attachment 2a Connection diagram of the TN system with data logger ...
Страница 116: ...Subject to alteration Updated 11 2015 A 4 Attachment 2b Connection diagram of the TT system with data logger ...
Страница 117: ...Subject to alteration Updated 11 2015 A 5 Attachment 3a EC Declaration of Conformity VARTA element 3 ...
Страница 118: ...Subject to alteration Updated 11 2015 A 6 Attachment 4b EC Declaration of Conformity VARTA element 6 ...