Installation
Tank Gauge Transmitter
6
Installation and Operations Manual
Figure 2-3: ATT Field Terminal Block Wiring
2.4.4
Connecting Host Communication
The procedure used to wire the ATT to the host computer depends on the type of host
interface option ordered with the ATT.
Terminal Block One TB1
Terminal Block Two TB2
1
L+
= ATTI expansion Bus +
power
12
S
= Space or
2
HPORT = ATTI bus HART Signal
11
M
= Mark or EIA485 -
3
L-
= ATTI expansion Bus -
power
10
B +
= ATT + power
4
C
= RTD C lead
9
B -
= ATT - power
5
B
= RTD B lead
8
--
= Reserved
6
A
= RTD A lead
7
--
= Reserved
Содержание Network Adapter 4000
Страница 2: ......
Страница 6: ...Advanced Technology Transmitter iv Installation and Operations Manual...
Страница 46: ...Specifications Tank Gauge Transmitter 36 Installation and Operations Manual...
Страница 48: ...Ordering Information Tank Gauge Transmitter 38 Installation and Operations Manual...
Страница 54: ...Theory of Operation Tank Gauge Transmitter 44 Installation and Operations Manual...
Страница 72: ...Modbus Implementation Tank Gauge Transmitter 62 Installation and Operations Manual...
Страница 78: ...Tank Gauge Transmitter 68 Installation and Operations Manual...
Страница 79: ...69 4000 NOTES...