The builder/Erector remains solely responsible for the
safety and appropriateness of all techniques and methods
utilized by its crew in the erection of the VP building.
The Builder/Erector is also responsible for supplying any
safety devices, such as scaffolds, runways, nets, etc. which
may be required to safely erect the metal building system
and to perform the SSR-Seaming Operation.
Unplug the electrical power source before performing
any service on the seamer tool.
Check and maintain all electical cords and connections.
Power source and electrical cords should have a 3 wire
grounding system.
Discontinue seaming operation in damp, wet conditions and
other undesirable weather conditions.
Provide safe operating procedures along edges of roof,
tuf-lites, and other roof openings.
Содержание SSR 900
Страница 2: ......
Страница 20: ...Model No VPHC 17 17 1 VP SSR HAND CRIMPING TOOL...