background image

     4. Other uses of hand crimping tool:
          SSR - Seam ends at upper and lower seams at roof curbs.
          SSR - Seam ends at upper and lower seams at roof stacks.
          SSR - Seam ends at valley/multi-gutters.
          SSR - Seams near parapet walls, wall to roof areas and roof height change

          SSR - Seams that are too close for proper clearances of the SSR seamer

      tool operation.

4 3/4"

FEMALE RIB

MALE RIB

*NOTE:

The 4 3/4" dimension must be held to assure correct operation
of the seamer tool and fit up of accessories and closures.

Model No. VPHC-17

STEP 20.

STEP 1 & 2. (page 19 & 20 of this manual)

STEP 1 & 2. (page 19 & 20 of this manual)

18

      areas.

1. Hand Crimp of "Starting End of SSR" for the seamer tool operation - "Female
    Leading Edge Only" as shown in

2. Hand Crimp of the SSR - Panel End Lap - "Female Leading Edge Only" as
    shown in

3. Hand Crimp of "Finish End of SSR" For Complete Tightness - as shown in

VP Hand Crimping Tool is recomended for starting the seaming process but not
required.  The hand crimping tool, if used properly, will provide a tighter, more
uniform seam upon which to start the seamer.  The VP Hand Crimping Tool is
available from your VP Service Center at an additional cost.

2.  VP - SSR HAND CRIMPING TOOL

SSR Joint Detail

Содержание SSR 900

Страница 1: ...V A R C O P R U D E N B U I L D I N G S SSR 900 Seamer Tool Manual The field guide for proper use of the Model 900 SSR Seamer Tool...

Страница 2: ......

Страница 3: ...e required to safely erect the metal building system and to perform the SSR Seaming Operation Unplug the electrical power source before performing any service on the seamer tool Check and maintain all...

Страница 4: ...5 Seaming Operation Start 7 10 6 Field Maintenance Troubleshooting 11 13 7 Seaming Information 14 8 Hand Crimping Information 15 1 VP SSR Hand Crimping Tool 17 2 Uses of Hand Crimping Tool 18 3 Step 1...

Страница 5: ...mer Tool With Handle Assembly 2 Field Manual 3 One 1 Finish Seam Gauge Instructions 4 Shipping Box Save for Storage Shipping VP Tool Serial No Model No VP 900 2 Do Not Discard 1 SSR SEAMER TOOL KIT CO...

Страница 6: ...ace feet per minute 4 Power required 20 Amp breaker minimum 5 Control on off switch forward single speed Down Slope 6 Each of the three 3 sets forming rolls and one 1 guide roll perform a part of the...

Страница 7: ...Tuck the female lip under the male lip and begin to pull the seam together c Second Set Rolls 2 5 Fig 3 Force the two parts of the seam together and begin the finishing process 2 roll fiber roller d T...

Страница 8: ...be run from seamer tool cord during seaming operation 2 Check Power Source if seamer tool slows down or voltage appears to drop A There are three 3 possible reasons 1 A lower rated cord than required...

Страница 9: ...n rolls Clean Mastic from rollers daily 4 Check tool for loose parts screws wheels forming rolls and electrical connections Repair replace as required 5 Lubricate drive chain which is enclosed under r...

Страница 10: ...in front of this manual TO BEGIN SEAMING OPERATION 1 Ensure proper engagement of the male and female hems Hand crimp with VP hand crimping tool or channel lock type S E A M D I R E C T I O N 1 TUCK S...

Страница 11: ...o the locked position 2 Position seamer on the beginning edge of the SSR Panel so that the first two stands of rollers straddle the seam and rest on the panel 6 5 4 Model No VP 900 Direction of Seamer...

Страница 12: ...of female lip Also it will slow down due to the additional thickness of metal This heavier load requirement can be detrimental to the seamer tool if it should come to a complete stall The operator sho...

Страница 13: ...tarting Seamer Tool at MIDPOINT OF SEAM It is possible to start Seamer Tool Model No VP 900 in the middle of a seam run however it is not recommended If required page 12 item 8 Guide Roll and forming...

Страница 14: ...od 3 When checking tool prior to seaming and during seaming operation check to see if set screws at bottom of rolls are tight Roll may drop down during seaming and damage panel seam if screws are not...

Страница 15: ...ed for tightness after each 8 hours of use a Remove rear chain drive cover one 1 set screw b Motor mount brackets are at front rear of electric motor two 2 at each end loosen as required c Reset tight...

Страница 16: ...the proper engagement of the forming rolls and the SSR panel seams Panel Module Must Be Maintained REF fig 1 2 and 3 4 3 4 HOLD WIDTH SPREAD CORRECT FIG 2 INCORRECT FIG 3 HEIGHT LOWERED 3 CORRECT FIG...

Страница 17: ...ide on and off easily with no force required 2 Special Note At Endlap Splices and SSR Panel Clip locations the gauge will fit tighter This is not cause for alarm the reason for the tighter fit is beca...

Страница 18: ...C Hand crimping at endlap to ensure proper engagement of seam for the continuing seaming operation 1 Crimping the female lip of the seam together D Hand crimping at finish end of seam to ensure the e...

Страница 19: ...am and check with the seam gage If the seam is wide adjust only station 3 This is the station at the rear of the machine Begin by loosening the set screw on the turnbuckle as shown in the diagram Due...

Страница 20: ...Model No VPHC 17 17 1 VP SSR HAND CRIMPING TOOL...

Страница 21: ...Model No VPHC 17 STEP 20 STEP 1 2 page 19 20 of this manual STEP 1 2 page 19 20 of this manual 18 areas 1 Hand Crimp of Starting End of SSR for the seamer tool operation Female Leading Edge Only as s...

Страница 22: ...VP SSR HAND CRIMPING TOOL Step 1 Positioning Stage 1 Place hand crimping tool on SSR rib over female leading edge female edge will fit into notch Fold handle as shown STAGE 2 STAGE 1 SEAM AFTER PHASE...

Страница 23: ...o VPHC 17 20 4 VP SSR HAND CRIMPING TOOL Place hand crimping tool on SSR rib over female leading edge female edge will fit into notch Fold handle as shown STAGE 2 STAGE 1 SEAM AFTER PHASE 2 CRIMP SEAM...

Страница 24: ...al or manufacturing and is not cause for rejection For field installation questions call your local VP Service Center The job number is included on all building plans Arkansas 870 534 6030 California...

Отзывы: