45
Revision D November 2022
4) Anchor the Monorail
A) Monorail Assembly for Concrete Backup (Figure 52).
Locate Monorail on foundation with side of Monorail on the construction line and rear edge of
Monorail foot forward of front face of Concrete Backup (Figure 52).
Orient the Monorail so that the Monorail tongues face the Concrete Backup (Figure 52).
Drill 5 1/2" [140 mm] deep anchor holes using the Monorail as a template. Do not drill through
foundation.
Warning:
Every borehole and slot in Backup and Monorail must be anchored by
a stud using an approved adhesive.
Anchor each Monorail section using the approved adhesive kits provided. See Figure 51 and the
approved adhesive kit instructions included with this manual (p. 12). It is important to attach each
segment of Monorail in alignment from the back to the front of the system (±1/4” [6 mm]).
Warning:
Improper alignment at the Monorail Splice Joints will prevent proper
system collapse during an impact.
Figure 53
Proper Stud Height
Figure 52
Monorail Location for Concrete Backup
ANCHOR
WASHER
ROADWAY
BACKUP OR MONORAIL
NUT
CAUTION:
1.5” [40 mm]
MAXIMUM STUD HEIGHT
TONGUE
Содержание QuadGuard
Страница 1: ...VALTIR QuadGuard CRASH CUSHION ASSEMBLY MANUAL PN 115348 REVISION D NOVEMBER 2022...
Страница 40: ...Valtir com 39 Revision D November 2022 Wide System Identification Figure 39 Wide Systems and Model Numbers...
Страница 65: ...Valtir com 64 Revision D November 2022 Notes...
Страница 66: ...Valtir com 65 Revision D November 2022 Notes...
Страница 67: ...Valtir com 66 Revision D November 2022 Notes...
Страница 68: ......